My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-11-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/02/2021 Regular and Special
>
AGENDA PACKET_2021-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 1:58:52 PM
Creation date
11/2/2021 1:58:05 PM
Metadata
Fields
Template:
City Clerk
Date
11/2/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TS.660Sjudifz!Xbufs!Jnqspwfnfou!Qspkfdu! <br />Dpotusvdujpo!Nbobhfnfou!'!Jotqfdujpo!Tfswjdft <br />| City of El Segundo <br />Berg served as primary construction manager for this Bid- <br />Build project. Approximately 950 feet of existing old water <br />mains, located primarily on two residential streets, were <br />hydrants, meters, air relief valves and associated laterals <br />Water Pipeline Replacement <br />as well as connections to existing systems, chlorination, <br />Improvement <br />El Segundo, CA <br />2019 <br />were removed and replaced at the request of the water <br />City of El Segundo <br />department. This extra work was tracked and paid on a <br />Lifan Xu, PE <br />T&M basis. <br />City Engineer, City of El Segundo <br />Mike served as lead inspector, overseeing the contractor’s <br />P: (310) 524-2368 <br />daily activities, monitoring contractor schedule and <br />E: lxu@elsegundo.org <br />City of Torrance <br />water main at the intersection of Hawthorne Boulevard <br />construction would not impede on access to businesses. <br />Other project services included trench excavation, pipe <br />laying, sidewalk reconstruction, cold milling, HMA paving <br />operations, pavement striping, and curb making. The <br />The second phase of this project has just kicked off and <br />Coast Highway Water Main Replacement <br />will widen the intersection at Hawthorne Boulevard and <br />Torrance, CA <br />2022 <br />turn lanes and right-turn pockets at all four approaches. <br />City of Torrance <br />New PCC pavement sections will generally consist of <br />Jointed Plain Concrete Pavement (JPCP) over Lean <br />Steven Finton, PE <br />Engineering Manager, City of Torrance <br />Concrete Base (LCB) over Class 3 Aggregate Base. <br />P: (310) 618-6260 <br />E: SFinton@torranceCA.gov <br />installation, relocation of catch basins, a small retaining <br />wall, new landscape, and irrigation. <br />discovered that the contractor had a defunct message board that would stop working, so he documented <br />Cfsh!'!Bttpdjbuft-!Jod/! <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.