My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-046 - Approving An Exclusive Agreement for the Collection and Handling of Soild Waste
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2021
>
2021-046 - Approving An Exclusive Agreement for the Collection and Handling of Soild Waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:01:19 PM
Creation date
11/4/2021 2:59:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2021-046
Item #
43
Date
8/17/2021
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Urban Consumers (CUUROOOOSAO), all items, U.S. city average, not seasonally adjusted, <br />until the WDAs expire in 2025. In the event that there is an extraordinary adjustment to <br />the Orange County Landfill per ton gate rates during or after the term of the WDAs, <br />Contractor may request an extraordinary rate adjustment to the Roll Off Tonnage <br />Charge as provided in this Agreement in Section 6.5. <br />6.4.5 Adjustment for Contractor's Monthly Compensation for Other Services <br />SWOne - Calculate the percentage increase or decrease in the CPI. The increase or <br />decrease in the maximum monthly compensation for other services will be for the <br />change in the average annual published indices for the twelve (12) month period ending <br />December prior to the July 1 when the rate change will take effect. <br />St�Two - Multiply the percent change from Step One by the existing compensation to <br />calculate the increase or decrease to the maximum rate. Then add (subtract) the change <br />in compensation to (from) the existing maximum compensation to determine the new <br />compensation. <br />6.4.6 Rate Adjustment for Construction and Demolition Roll -Off Box and Bin <br />Services <br />Stev One - Calculate the percentage increase or decrease in the index listed in Section <br />6.4.2. The increase or decrease in the rate adjustment index will be for the change in the <br />average annual published indices for the twelve (12) month period ending December <br />prior to the July 1 when the rate change will take effect. <br />Step Two -Multiply the total percent change from Step One by the existing rates to <br />calculate the increase or decrease to the maximum rates. Then add (subtract) the <br />change in rates to (from) the existing maximum rates to determine the new maximum <br />rates. <br />6.4.7 Rate Years Two through Four Special Rate Adjustments <br />In an effort to reduce the initial rate impact to ratepayers, the Contractor shall receive <br />the following compensation in addition to the rate adjustment methodologies included <br />in Sections 6.4.2 through 6.4.6: <br />Rate Year Two (July 1, 2023 - June 30, 2024) 1.0% <br />August 17, 2021 117 City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.