My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBUILD SPECTRUM
Clerk
>
Contracts / Agreements
>
PROJECTS
>
IBUILD SPECTRUM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 4:15:46 PM
Creation date
11/15/2021 10:14:28 AM
Metadata
Fields
Template:
Contracts
Company Name
IBUILD SPECTRUM
Contract #
P 21-7533, 7534
Agency
Public Works
Council Approval Date
10/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:l:) <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project Nos. 21-7533, 21-7534, 21-7535 Campesino Park, Change Order Number 1 <br />a Memorial Park, & Madison Park Restrooms <br />CD <br />z To Build Spectrum Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTILAPPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless othenvise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />JUSTIFICATION <br />WORKS AGENCY <br />1. To compensate the contractor for costs associated with extra electrical work and installation <br />of chain -link fence at Campesino Park (PCO No. 03). <br />TOTAL COST = $26,553.50 <br />2. To compensate the contractor for costs associated with raising the Memorial Park Restroom <br />pad elevation by an additional 1" (PCO No. 07). <br />TOTAL COST = $5,251.36 <br />3. To compensate the contractor for costs associated with extra grading and sod at Campesino <br />Park (PCO No. 12). <br />TOTAL COST = $9,955.00 <br />4. To compensate the contractor for costs associated with sod substitution at Campesino Park <br />(PCO No. 13). <br />TOTAL COST = $896.00 <br />5. To compensate the contractor for costs associated with additional grading and irrigation <br />installation at Campesino Park (PCO No. 15). <br />TOTAL COST = $3,331.39 <br />TOTAL AGREED COST: $45,987.25 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.