My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBUILD SPECTRUM
Clerk
>
Contracts / Agreements
>
PROJECTS
>
IBUILD SPECTRUM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 4:15:46 PM
Creation date
11/15/2021 10:14:28 AM
Metadata
Fields
Template:
Contracts
Company Name
IBUILD SPECTRUM
Contract #
P 21-7533, 7534
Agency
Public Works
Council Approval Date
10/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />v <br />OD <br />CV <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project Nos. 21-7533, 21-7534, 21-7535 Campesino Park, Change Order Number 3 <br />Memorial Park, & Madison Park Restrooms <br />To iBuild Spectrum Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />JUSTIFICATION <br />PUBLIC WORKS AGENCY <br />1) To compensate the contractor for costs associated with providing 24-hour security on weekends per <br />the City's request (PCO 16R1). <br />TOTAL COST = $9,660.00 <br />2) To compensate the contractor for costs associated with the installation of four additional solar light <br />towers at Madison Park per City request (PCO 17). <br />TOTAL COST = $15,127.56 <br />3) To compensate the contractor for costs associated with additional 148sgft of DG and extra Mow <br />curb (PCO 26). <br />TOTAL COST = $10,344.25 <br />4) To compensate the contractor for costs associated with labor and materials to paint the inside of the <br />new electrical room at Madison Park (PCO 23R1). <br />TOTAL COST = $8,234.00 <br />5) To compensate the contractor for costs associated for grading new restroom planter areas, install <br />only of City provided mulch (PCO 24). <br />TOTAL COST = $22,683.75 <br />6) To compensate the contractor for costs associated for two 24" box trees Modesto Ash, two <br />additional bubblers for existing irrigation laterals, and 1 O' x 16' decomposed granite with stabilizer 4" <br />only (PCO 25). <br />TOTAL COST = $19,338.40 <br />7) To compensate the contractor for costs associated to the relocation of the Electrical Panel at <br />Madison Park (PCO 8R4). <br />TOTAL COST = $112,075.00 <br />TOTAL AGREED COST: $197,462.96 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.