Laserfiche WebLink
Grovemont Street Water Main Improvements <br />November 16, 2021 <br />Page 2 <br />2 <br />2 <br />2 <br />4 <br />Public Outreach and Contractor ParticipationAs legally required, a Notice Inviting Bids <br />was advertised in the Orange County Register newspaper on September 7 and 8, 2021. <br />The project was also advertised in PlanetBids from August 31, 2021, through September <br />28, 2021. To provide an opportunity for local vendors to submit bids, the City <br />electronically notified a total of 535 regional vendors, many of which are based in Santa <br />Ana. Fifty-five vendors requested bidding documents, and a total of nine bids were <br />received. No bids were received from Santa Ana contractors. <br />Bid Results Summary <br />RANK BIDDER’S NAME LOCATION BASE BID <br />1 Stephen Doreck Equipment <br />Rentals, Inc. Pico Rivera $ 1,265,465.00 <br />2 J. De Sigio Construction Baldwin Park $ 1,573,772.00 <br />3 Vido Samarzich, Inc.Rancho <br />Cucamonga $ 1,577,010.00 <br />4 SRK Engineering Escondido $ 1,803,800.00 <br />5 Ramona Inc. Baldwin Park $ 1,843,465.00 <br />6 Excel paving Co Long Beach $ 1,919,845.00 <br />7 Colich & Sons L.P.Gardena $ 2,582,075.00 <br />8 Murray Company Rancho <br />Dominguez $ 2,669,114.00 <br />9 CEM Construction Corp. Montebello $ 3,240,510.00 <br />All nine bids received were deemed responsive. Stephen Doreck Equipment Rentals, <br />Inc., submitted the lowest responsive base bid in the amount of $1,265,465 (Exhibit 2). <br />As specified in the bid documents, the lowest bid shall be determined on the basis of the <br />Base Bid. Based on the bid analysis and a contractor’s reference check, staff <br />recommends awarding the construction contract to Stephen Doreck Equipment Rentals, <br />Inc., in the amount of the base bid totaling $1,265,465 (Exhibit 3). Stephen Doreck <br />performed three previous projects for the City of Santa Ana: <br />Project 10-6403 Catalina Street Pump Owner’s Association Water Service <br />Connection <br />Project 15-6448 Thornton Park Neighborhood Water Main Improvements <br />Project 21-6457 Valley Adams Neighborhood Water Main Improvements Phase 2. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />City Council 14 –2 11/16/2021