My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BERG AND ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
B
>
BERG AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 9:51:27 AM
Creation date
11/22/2021 9:43:10 AM
Metadata
Fields
Template:
Contracts
Company Name
BERG AND ASSOCIATES, INC.
Contract #
A-2021-212
Agency
Public Works
Council Approval Date
11/2/2021
Expiration Date
11/1/2024
Insurance Exp Date
3/1/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Detail drawings govern over general drawings <br />3. Addenda and change order drawings govern over Contract Drawings <br />4. Contract Drawings govern over standard drawings <br />M. Temoorary Shoring Svst <br />The project is surrounded by existing business and the SR 55 Freeway. In order to excavate the <br />jacking and receiving pits, the Contractorwill be required to implement a temporary shoring system. <br />The Contractor shall submit shoring design stamped by a civil or structural engineer registered in <br />the State of California. Geotechnical parameters for the shoring design are contained in the <br />geotechnical report. <br />The choice of shoring method will be left to the Contractor's judgment since economic <br />considerations and/or the individual Contractor's construction experience may determine which <br />method is more economical and/or appropriate. However, other factors such as the location of <br />nearby utilities, encroachment on adjacent properties, and allowable vibrations may influence the <br />choice of support. Minimum parameters/loads for design of a temporary shoring system are <br />provided in the geotechnical report. <br />All trenching, sheeting, shoring and bracing shall be in accordance with the State of California, <br />Occupational Safety and Health Administration (Cal/OSHA) criteria. Excavation shoring systems <br />shall conform to the applicable Section of Article 6, Title 8 of the State of California Construction <br />Safety Orders. <br />N. Days Lost Due to Weather Conditions <br />In setting the Contract Time, it has been assumed that up to twenty (20) working days may be lost <br />as a result of weather conditions which will slow down the normal progress ofwork. Therefore, no <br />extension in Contract Time shall be allowed for the first twenty (20) working days lost due to <br />weather conditions. <br />The following agencies and property owners will require special coordination requirements. <br />The following is a summary of these requirements: <br />Metropolitan Water District: The Contractor shall request a shutdown of the <br />existing MWD SA-7 meter facility through the City of Santa Ana. The request <br />for shut down of the MWD turnout shall be in writing to the City a minimum of <br />three weeks prior to making the connection to the pipeline east of the freeway and <br />three weeks prior to the transfer of operation from the existing SA-7 facility to <br />the new SA-7 facility. <br />2. Western Exterminator Company: The Western Exterminator Company is located <br />adjacent to the City's SA-7 property. To perform the required construction, the <br />City is in the process of obtaining the new proposed property and the temporary <br />construction easement from Western Exterminator Company. The Contractor <br />City of Santa Ana RFP 21-066 <br />Page Al-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.