My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BERG AND ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
B
>
BERG AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 9:51:27 AM
Creation date
11/22/2021 9:43:10 AM
Metadata
Fields
Template:
Contracts
Company Name
BERG AND ASSOCIATES, INC.
Contract #
A-2021-212
Agency
Public Works
Council Approval Date
11/2/2021
Expiration Date
11/1/2024
Insurance Exp Date
3/1/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SR-55/Ritchey Water Improvement Project <br />Construction Management & Inspection Services <br />On -Call Capital Improvement Program I City of <br />Santa Monica <br />Berg currently holds an on -call contract for various CIP <br />projects that began in January of 2016. <br />FY 15/16 Annual Water Replacement. This $1.4 million <br />project constructed along Ocean Avenue included <br />upgrades to the City's waterline distribution system, <br />and restored asphalt roadway paving and striping. <br />After approximately 2,000 ft. of existing water main was <br />replaced, 110,000 square feet of Ocean Avenue roadway <br />was ground and capped with rubberized hot mix asphalt. <br />The work began next to the highly congested entrance to <br />the Santa Monica Pier and included consistent outreach <br />to the business and residential communities. <br />FY 18/19 Annual Water Replacement. This $4.9 million <br />project had similar elements to the FY 15/16 project but on <br />a larger, more complex scale. The replacement of 7,000 <br />ft. of water mains were scattered throughout the city at <br />10 different locations. Some locations were residential, <br />and some were commercial, and some were both. The <br />projects biggest challenge of keeping all stakeholders informed was successfully met by the CM team. <br />FY 19120 Annual Water Replacement. This third fiscal year water main project involves 13 project <br />locations that encompass businesses, residences, and schools. Work includes installation of 8" and 12" <br />PVC and PVCO, rehabilitation of existing pipe, installation of new gate valves, new fire hydrants, and <br />service lines, as well as connections to existing systems, chlorination, flushing, pressure testing, and <br />reconstruction of the trench and roadway to final grade. It also entails extensive traffic control, coordination <br />of existing services, and replacement of damaged traffic loops detectors. <br />Frisbie Park Sewer Lift Station I City of Rialto <br />Berg provided construction management, inspection, and <br />certified payroll services for the construction of a sewer lift <br />station, a force main, storm drain modifications, and two <br />gravity lines within a park in Rialto. <br />Work that contained roadway improvements required <br />cold -milling, construction of ADA ramps, double adjusted <br />manholes, backfill and compaction tests, and installation of <br />traffic loops. The 4-month project also included installation <br />of new 4-inch diameter PVC pipe and 8-inch diameter <br />clay pipe. Much emphasis was placed on coordination <br />with the utility companies for the project. The Berg Team <br />encountered several utility companies delays but was able <br />to coordinate with utility executives to resolve the issues <br />and to move the project faster towards completion. <br />Berg & Associates, Inc. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.