Laserfiche WebLink
WE <br />.r..manr.. <br />emm <br />paMw nneinu�m <br />1.1.11n no- <br />�bmrrrs mi. <br />A <br />•+ww� <br />wnN'�m <br />wnq <br />w.y.ewm. <br />�.,..an, <br />fib-•.+,,y'w.w <br />■■O■■■■■■■■ <br />■ <br />■ <br />Berg B Associates, Inc. <br />SR-55/1Ritchey Water Improvement Project <br />Construction Management S Inspection Services <br />Notes from Project Manager, Dave Smith, PE, QSD <br />A. Insue: The Contract time noted in Me Specifications does not allow for Me work W We completed <br />within Me requirements as Identified In Me RFP, <br />1. Project commences 11/1N1, has 450 WD's, plus the 60 W33 for PH-2 (per Addendum) and 1hemMm, <br />must aid-121150 (See items 13.1 & 3.2 below). <br />2. Cannot begin SR-55 Jack B Sam Oil 711122 and this operation is to take 4 mome (See hems 3.3_4,.5 <br />& 8 below), therefore Jack & Be. begins on WD 167 and ends on WD 250. <br />3. Cannot begin SA-7 Pressure Reducing reality, Phase 1 Leal SR-55 JackA Bore is done (Sae Item B 6 <br />below), therefore SA-7 Phi begins WD 251 and ends-40 WD later WD 291. <br />4. CaMans to complete ROD adjacent to SA-7 holds between Phase 1 &2, and a agave! 12 months to <br />sessions this (See Ihm 7), therefore Call ROB wore bceins WD 291 and ends WD 537. <br />5. SA-7 Ph2 cannot commence unfil Cadmns RCB window (12 months) is complete and SA.7 Ph-2/ <br />Closeout is albwetl to take months, therefore Mis work begins WD 537 and ends WD 617. <br />6. easetl on aifical path, the com2d would Wks an addidoanl-W WD's beyond the sloped 530 WD a. <br />B. Bankgraund <br />1. The provided Conrad Specifications (section PRPOSAL, page P-5of P-21) indicate the Contractor has <br />450 woddng days to complete ail work eacapi PH42, and PH-2 is allowxtl 0o woddng days. P4derdum <br />2 intruded these as not concurrent Mumble requiring 530 W. This m approximately 26 months told. <br />2. The CM RFP sedbn INTRODUCDOWBACKGROUND, page At .1. lid pamgmph, stales Mal <br />mnsMctlon to begin fall of2021. For Mere purposes, we them assumed been November 1, 2021. <br />3. The CM RFP section INTRODUCTIONIBACKGROUND, subsection Localbn of Project Sites, page Al- <br />3, 3d paragraph, sbdes Mat consbucton M the new Sams Are (Weslem Bsiemu redy m) ri9nt of way <br />and easements may net commence until Juan or July 2022. For these purposes, we have assumed <br />Juty 1, 2022. <br />4. The CM RFP section INTRODUCTIOWACKGRCOND, subsection LacaSon of Reject Sites, IageAt- <br />3, 5th paagaph, states luat emanation in the RICOH nigh ofway and easements may not commence <br />undl Jue or July 2022. Forthese purposes, we haveasswne! July 1, 2022. <br />5. i eCM RFP sedian AODmONALCONSTRUCTION INSTRUCTIONSIINFORMATION, subsection D <br />SequenceofCowmxtlon,page Al-7,panagmph2and3,mftmt mmmenh3and4noedabove. <br />6. The CM RFP section ADDITIONAL CONSTRUCTION INSTRUCDONSBNFORMADON, subtract <br />Sequence ofConstrucpon, sub -item 1, gageAl-7, Make that coredbuction of the jack and team under <br />the SR-55 shall be mmplded prbrh mnsimotion ofihe abated SA-7 Facildw antl thattha Jack 6 <br />Bone to be assumed to take 4 months. <br />7. The CM RFP sedamn ADDITIONAL CONSTRUCDON INSTRUCTIONS4NFORMATION, subsection D <br />Sequence ofComputation, suhitems 6, 786, page At-6, slates that: <br />a. The Finaxay Widening project can not *in until Me missing SA-7 facility s taken out of <br />senica(new ono is in service, Phase 1). <br />b. No near site impmvamenls can be oanshuded on Me Calm re easement until Cadmus <br />connector has comnuctnd their new B's 4'RCB. These raw site impanonerds are known as <br />Phase 2. <br />c. The Crass; aunk is to be assumed rotake 12 months. <br />C. Pomntlel Resolutions <br />1. Fatend the Cmmadfimato allow fbrtha needed Umeof Galleons 12 month window This mak! <br />increase the time by as,.. WMe In appmx. 6W. <br />2. Make the pallon of the Cal are window that does rot have contact work on R, noamntrad wanking <br />days as long as the City contractor is not around, This woad add approximately mourns (60 Me). <br />3. Alkwr all submillals and pipe proauamerd to occur dung an adminksbarse NTP and begin the Project <br />cansbuction (NTP) at War data instead of November 2021(sm don B2 above). <br />