Laserfiche WebLink
documentation including submittals, all project correspondence, RFIs, RFQs, CCOs and potential changes. <br />Brenda assists with estimates and tracks all project costs for both the contractor and the construction <br />management team. She compiles work progress data from inspection reports and meeting notes to assist <br />the Resident Engineer in preparing the weekly and monthly project status reports. She compiles and <br />disseminates meeting notifications, agenda, and meeting minutes. She gathers and confirms completeness <br />of inspection and all staff daily reports and labor compliance certified payrolls. She tracks subcontract <br />usage, compiles and files technical survey and materials testing reports. This $84 million grade separation <br />project in the City of Industry involves over 14,000 feet of railroad track construction, over 10,000 feet of <br />retaining wall construction, 3 bridges structures (UPRR, roadway, and pedestrian), and an extensive, deep <br />sewer and storm drain with dewatering measures. This complex 5-stage project has 19 phases that require <br />the closure of the City's main thoroughfare while Fullerton Road is lowered under the existing UPRR tracks <br />and a four -track railroad bridge is built. <br />Jr. Office Engineer, Green Port Gateway Rail Project (Track Realignment Ocean Blvd & Pier F Ave Support <br />Tracks), Port of Long Beach, Long Beach, CA. Berg & Associates, Inc. 2012-2016. Brenda provided weekly <br />and monthly project status reports including plan and drawing graphics, PowerPoint presentations and <br />spreadsheets to analyze project costs and staffing levels. She assisted with project record documentation, <br />generated and distributed meeting notes, and monitored UDBE contract compliance. Brenda provided <br />quality assurance of change order packages and provided weekly board memos. She compiled daily reports <br />and time sheets for approval by the POLE and assisted with processing monthly billing while tracking <br />construction management costs for this $93 million high impact project for the Port. <br />Program Coordinator, South Bay Workforce Investment Board, Hawthorne, CA. 2011 — 2012. Brenda <br />managed and designed a $989,000 federally funded training program to place participants interested in <br />employment in green construction. Work activities included coordination of industry associations, trainers, <br />case managers and one -stop centers; grant monitoring; monthly, quarterly reporting; chairing meetings; <br />marketing and outreach. She provided administrative support on a $45 million National Emergency Grant; <br />performed outreach enrollment, online case management supervision, and maintained accurate file logs, <br />contacts, and meeting minutes. <br />Program Coordinator, AmeriCorps VISTA, California Conservation Corps, Norwalk, CA. 2009 — 2010. <br />Brenda generated and administered a statewide health and safety survey to assess the efficiency and <br />effectiveness of maintenance operations for the agency. This resulted in a fully written training program <br />for 3,000+ California state employees. Brenda developed "train the trainer" teaching guides and <br />curriculum, coordinated workshops to provide green literacy, and facilitated bi-weekly group discussions <br />with 16 centers to promote green initiatives. <br />Accounting Assistant, Turner Construction, Los Angeles and Anaheim, CA. 2004-2009. Brenda assisted <br />managers and senior office accountants to reconcile ledgers, audit and process expense reports and <br />invoices. She maintained highly accurate bookkeeping records and was responsible for monitoring <br />Accounts Payable and providing administrative support. She prepared daily, monthly, quarterly and yearly <br />financial reports. <br />7 Berg & Associates Inc. <br />