My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BERG AND ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
B
>
BERG AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 9:51:27 AM
Creation date
11/22/2021 9:43:10 AM
Metadata
Fields
Template:
Contracts
Company Name
BERG AND ASSOCIATES, INC.
Contract #
A-2021-212
Agency
Public Works
Council Approval Date
11/2/2021
Expiration Date
11/1/2024
Insurance Exp Date
3/1/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Position with the Company <br />Inspector & Utility Specialist <br />Years of Experience <br />39 Years of Experience <br />Length of Time with the <br />Company <br />14 Years with Berg <br />Licenses, Registrations and <br />Certificates <br />Metrolink Roadway Worker <br />Protection Trained <br />RR Education Roadway <br />Worker Protection Trained <br />OSHA 40-hr HAZWOPER <br />OSHA Permit -Required <br />Confined Space Entry <br />OSHA 30-hr Occupational <br />Safety & Health Training <br />Course, Construction Safety & <br />Health <br />OSHA Fall Protection <br />American Safety & Health <br />Institute Basic First Aid <br />Educational Background <br />AA Electricity, Pasadena City <br />DOMINIC COSTELLO <br />Utility Coordinator <br />Experience <br />Dominic has over 39 years of construction experience managing <br />multimillion -dollar projects for transportation agencies, cities, <br />counties, and Caltrans. He has extensive experience with rail yards, <br />rail stations and platforms, grade separations, street improvement <br />projects, and beautification projects involving the installation of curb <br />and gutter, subgrade preparation, water mains, storm drains, pump <br />stations, retainingwalls, paving, striping, and landscape. Dominic is an <br />excellent utility coordinator and brings electrical experience with <br />traffic signals, lighting systems (single and series), installation of traffic <br />signal controllers, installation of utility conduits, and electrical service <br />installations. Dominic is knowledgeable in Caltrans Standard Plans & <br />Specifications, Green Book Standard Plans & Specifications and the Work <br />Area Traffic Control Handbook (WATCH Manual). <br />Work History <br />Lead Inspector, Fullerton Road Grade Separation, San Gabriel Valley <br />Council of Governments (SGVCOG)/Alameda Corridor -East <br />Construction Authority (ACE), City of Industry, CA. Berg & Associates, <br />Inc. Jul. 2019 —July 2021. Dominic is serving as lead inspector for this <br />$84 million grade separation project in the City of Industry that <br />involves over 14,000 feet of railroad track construction, over 10,000 <br />feet of retaining wall construction, 3 bridge structures (UPRR, <br />roadway, and pedestrian), and an extensive, deep sewer and storm <br />drain with dewatering measures. This complex 5-stage project has 19 <br />phases that require the closure of the City's main thoroughfare while <br />Fullerton Road is lowered under the existing UPRR tracks and a four - <br />track railroad bridge is built. <br />Utility Coordinator/Lead Civil Inspector, Raymond Avenue Grade <br />Separation, City of Fullerton/Orange County Transportation <br />Authority (OCTA), Fullerton, CA. Berg & Associates, Inc. 2014 — Nov. <br />2018. Dominic coordinated with utility companies for the relocation <br />of major pipelines and underground, as well as overhead, utilities for <br />this $45 million grade separation. He oversaw inspection of civil work <br />which began with utility relocations followed by new construction of <br />a railroad shoofly and bridge construction. Dominic coordinated the <br />building of the detour road which included at -grade crossings for the future mainline tracks as well as the <br />shoofly tracks. This required extensive signal coordination to maintain PUC requirements. He coordinated <br />with BNSF flagmen, signals, and track construction to implement a double -track shoofly during construction <br />l� Berg & Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.