Laserfiche WebLink
Lodal Assistance Procedures Manual EXHIBIT 10,H1 <br />Coat Proposal <br />EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3 <br />CAST -PLUS -FIXED 1`83 OR LVIPP SUM OR FIRM FIXED PRICE CONTRACTS <br />(CALCULATIONS FOR ANTICIPATED SALARY INCREASES) <br />1. Calculate Average Hourly Rate for tat yearof the contract (Direct Labor Subtotal divided by total hours) <br />Direct Labor <br />Total Hours per <br />Avg 5 Year <br />S*Mal per Cost <br />coat Proposal <br />Hourly Contract <br />Proposal <br />Rate Duration <br />$25D,000AO <br />S00 <br />a $0100 Year Avg <br />Hourly Rate <br />2. Calculate hourly rate for all years (Increase the Average Hourly <br />Rate for a year by proposed escalation %) <br />Avg Hourly Rate <br />Proposed Escalation <br />Year 1 <br />$50,00 <br />+ 2°% _ <br />$61.00 Year 2 Avg Hourly Rate <br />Year 2 <br />$51,00 <br />+ 2% _ <br />$52.02 Year 3 Avg Hourly Rate <br />Year 3 <br />$52.02 <br />+ 2^/e - <br />W.06 Year 4 Avg Hourly Rate <br />Year 4 <br />$53.08 <br />+ 2"% _ <br />$54.12 Year 5 Avg Hourly Rate <br />3. Calculate <br />estimated hours par year (Multiply eatlmate % each yearby total hours) <br />Estimated % Completed <br />Total Hours per Cost <br />Total Houra per <br />Each Year <br />Proposal <br />Year <br />Year 1 <br />20.0% <br />" 8000 = <br />1000 Estimated Hours Year 1 <br />Year 2 <br />40.0% <br />5000 <br />2000 Estimated Hours Year 2 <br />Year <br />1510% <br />5000 = <br />750 Eatim ated Hours Year 3 <br />Year 4 <br />16.0°% <br />• 5000 m <br />780 Estimated Hours Year 4 <br />Year 5 <br />10.0°% <br />5000 r <br />500 Estimated Hours Year 5 <br />Total <br />100% <br />Total = <br />5000 <br />4. Calculate Total Casts Including Escalation (Multiply Average Hourly Rate by the number of hours) <br />Avg Hourly Rate <br />Estimated hours <br />Cost per <br />(calculated above) <br />(calculated above) <br />Year <br />Year 1 <br />$50 00 <br />1000 - <br />$50,000,00 Estimated Hours Year 1 <br />Year <br />$51,00 <br />2000 c <br />$102,00040 Estimated Hours Year 2 <br />Year 3 <br />$52.02 <br />750 <br />$30,015.60 Estimated Hours Year 3 <br />Year <br />$53.06 <br />7&0 = <br />$39,705.30 EetimatedHours Year 4 <br />Year& <br />$54,12 <br />500 a <br />$27,060.80 Estimated Hours Year b <br />Total Direct Labor Cost with Escalation = <br />$257,871.10 <br />Direct Labor Subtotal before Escalation <br />$250,000,00 <br />Estimated total of Direct Labor Salary = <br />Transfer to Page 1 <br />Increase <br />$7,571.10 <br />NOTES: <br />1. Thistanottheonlywaytoestimatesalatyincreases,Othermethodawlllbeacceptedif.theyclaarlyindicatethe°% <br />Increase, the 0 of years of the contract, and a breakdown of the laborto be performed each your, <br />2 An estimation that is based on direct labor multiplied by salary Increase % multiplied by the 0 of years is not <br />acceptable. <br />(Le, $250,000 x 2% x 5 yra = $25,000 is not an acceptable methodology) <br />3. This assumes that one yearwlll be worked at the rate on the cost proposal before salary Increases are granted. <br />4. Calculations for anticipated salary escalation must be provided, <br />2of0 <br />2020 <br />