My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUCKNAM INFRASTRUCTURE GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 4:11:11 PM
Creation date
12/2/2021 4:09:52 PM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP, INC.
Contract #
A-2021-211
Agency
Public Works
Council Approval Date
10/19/2021
Expiration Date
10/18/2023
Insurance Exp Date
9/16/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5 - Final Report <br />The consultant shall prepare a final Pavement Management Program report and any other <br />required submittal items, as per OCTA guidelines. The report shall include, without <br />limitation, the methods, findings and recommendations of the consultant, which shall be <br />presented in a single comprehensive document which, should include findings generated <br />as part of other tasks described herein. <br />Task 6 - Database Update and GIS Map Integration (Optional Tasks) <br />There are approximately 30 or less segments of roadway to be added/deleted/combined <br />from database (City will provide the list). <br />The Consultant shall integrate GIS mapping (ESRI) with StreetSaver database / Generate <br />updated GIS sharp file. <br />General Requirements <br />• All work shall be performed in conformance with the City and OCTA's policies, <br />procedures, and standards. <br />• The Consultant has total responsibility for the accuracy and completeness of all <br />inspections performed and documents prepared. The documents furnished under the <br />Agreement shall be of a quality acceptable to the City. The criteria for acceptance shall <br />be a product of neat appearance, well organized, and technically and grammatically <br />correct. The assumption of the number of review rounds is not allowed. <br />• The City has traditionally used paper distress forms but electronic data collection (using <br />laptop/tablet computers) will be acceptable. The paper distress forms shall be submitted <br />to the City for the City's records or the methodology for upload of electronic data <br />collected shall be clearly defined and a method for data verification provided. <br />Proiect Deliverables <br />• Updated database in StreetSaver. <br />• Final PMP report; digital file on CD and 1 hard copy. <br />Proiect Schedule and Milestones <br />• Kickoff Meeting & Notice To Proceed <br />October 12, 2021 <br />• Complete inspection & submit inspection data for review <br />February 18, 2022 <br />• Complete Budgetary Analysis <br />March 18, 2022 <br />• Submit Draft Pavement Management Report <br />April 15, 2022 <br />• Complete Final Pavement Report <br />May 6, 2022 <br />• City Council Approve PMP Report <br />June 7, 2022 <br />City of Santa Ana RFP 21-076 <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.