My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUCKNAM INFRASTRUCTURE GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 4:11:11 PM
Creation date
12/2/2021 4:09:52 PM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP, INC.
Contract #
A-2021-211
Agency
Public Works
Council Approval Date
10/19/2021
Expiration Date
10/18/2023
Insurance Exp Date
9/16/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firm and Team Experience <br />He has been involved with over 35 pavement management projects and brings his wealth of <br />PMP software, GIS and inspection experience to this project. Aaron is a certified ASTM D6433- <br />16 inspector. <br />TIM FENNESSY, Field Technician, will be a supportive field surveyor for this project. His <br />responsibilities will include surveying, quality control, and working with our management staff <br />ensuring the updated PMP database is complete. Mr. Fennessy has been involved with over 41 <br />pavement management projects and brings his wealth of PMP software, GIS and inspection <br />experience to this project. Tim is a certified ASTM D6433-16 inspector. <br />With three technicians on this project that are trained in the Army Corps of Engineers survey <br />methodology and available to begin work immediately; our survey schedule will be expedited. <br />Our team will be able to survey the entire 450 miles of pavement within eight (8) weeks' time <br />due to our familiarity with the Santa Ana PMP network, experience, availability and man- <br />power. <br />In case of heavy rain that can potentially delay scheduled street inspections, our team includes <br />two (2) additional certified PMP inspectors that can be added to our Field Technician team <br />above, if necessary. <br />Team Organization Chart <br />Availability of Staff <br />• Project Manager (65%) <br />• Principal -In -Charge (100%) <br />• GIS Analyst (75%) <br />• Field Technician(s) (85%) <br />2-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.