Laserfiche WebLink
Fee Proposal 9- <br />Fee Proposal <br />Buckram Infrastructure Group, Inc. has included a time and materials, not -to -exceed fee for the <br />City's consideration (separate envelope). Our fee follows the described tasks shown within the <br />Scope of Work. <br />Additionally, we have created specific line item fee summaries to show the projected costs for <br />surveying all MPAH, Local and Alley networks this fiscal year. <br />Bucknam is willing to "lock -in" our current hourly rate schedule for the City's three-year PMP <br />contract as well as for the potential latter two years through FY 2025. <br />As indicated within our fee, all tasks are negotiable. <br />6-1 <br />