City of Santa Ana Page 2 of 3
<br />Flower St. Sewer Main Improvements {10 6818), bidding on 0910912021 2'.00 PM (PI)T) Printed 0912112621
<br />Lire Items
<br />Discount Terms NoDiscount
<br />'.11emi Item ''.,Type Item DescriptionUGM
<br />qTY
<br />Unit Price I'., Line Total
<br />Response, Commend
<br />7F - Code
<br />Section 1
<br />,.......
<br />63,581,155.tl0
<br />..
<br />.........
<br />1 -
<br />. .... .......... ..... ........... ...... ....... ........ .. ........... ..... .... .. ......... ._ ... ......... .. .... .....
<br />Mobdl2ation/Damobil€Zarlon(No more than 5%total bid)
<br />... ...
<br />LS
<br />...............
<br />1
<br />...............
<br />$150,000.00
<br />........._.......
<br />$150,000.00
<br />... ... ......... ..........
<br />Yes
<br />2
<br />Prepare and lm lement Trattie Camrol Plan
<br />LS
<br />1
<br />$150,00000
<br />$160,000.00
<br />Yes
<br />3
<br />Stonttweter Best Management Practices (BMP)
<br />LB
<br />1
<br />$15,000.D0
<br />$15,000.00
<br />Yes
<br />4
<br />Furn€sh Tem orary Sewer By-pass Pumping System
<br />LS
<br />- 1
<br />$126,000.00
<br />$125,000,00
<br />. Yes
<br />5
<br />Remove and Dispose Existing 8" VCP Sewer Pipe
<br />LF
<br />. 707
<br />I $40.00
<br />$29,280.00
<br />Yes
<br />6
<br />Remove and Dispose Existing 10" VCP Sewer Pipe
<br />LF
<br />BOB
<br />$50.00
<br />$25,400.00
<br />Yes
<br />7
<br />Remove and Dispose Existing 12" VCP Sewer Pipe
<br />LF
<br />1665
<br />$6DA0
<br />- $83,250.00
<br />Yes
<br />8
<br />Construct 8" PVC (SDR 26) Sewer Pipe
<br />LF
<br />127
<br />1 $376.00
<br />- $47,625.00
<br />Yea
<br />9
<br />.....
<br />Construct l0"PVC (Sop 26}Sewer pipe',
<br />) S
<br />LF
<br />is
<br />$3900tl
<br />$S,BSn,nO
<br />$5,
<br />Yea
<br />... ........
<br />la
<br />........... ... _ ..(.......... .... .......,............. ........ ._ ..._. ..._ . ,..,_ _ . ,....................... .... .. .... ........_ _ .
<br />Construct 12" PVC (SDR 26} Sewer Pipe
<br />..
<br />LF
<br />.....
<br />- 692
<br />...
<br />�'� $406 00
<br />_ ..........
<br />: $280,260.00
<br />........ ...
<br />Yea
<br />11
<br />-' Construct 15" PVC (SDR 26) Sewer Pipe
<br />LF
<br />j 2361
<br />$440,00
<br />: $1,030,040,00
<br />Yea
<br />12
<br />construct New 45" Precast Concrete Eccentric Cane Manhole Par City Std. plan No, 1201AOFASpF
<br />I, E-A
<br />. 11
<br />',, $7,00nAa
<br />$77,000,00
<br />Yes
<br />13 j
<br />Construct New P.G.C. Drop Sewer Manhole Per City Std. Plan 1201A
<br />EA
<br />1
<br />$8,500.00
<br />$8,500.00
<br />Yes {
<br />14
<br />NOT USED
<br />_
<br />0,
<br />$0c0
<br />$0.00
<br />Yes
<br />- is
<br />Pressure Wash And Protect Existing Manhole in Place, Clean Existing Manhole And Coat Manhole Interior With 125 ML.
<br />EA
<br />3
<br />1 $4.00D 00
<br />$12,000.00
<br />vas
<br />Epoxy/Polyurethane Lining System Including The Base.
<br />' 16
<br />Reconnect All Existing Live Sewer Main To New Manhole
<br />EA
<br />5
<br />: $3,000.00
<br />! $15,000.00
<br />Yea
<br />17
<br />Protect Existing Sewer In Place
<br />LS
<br />1
<br />P $15,OOD.00
<br />$15,000.00
<br />Yes
<br />18
<br />Abandon Existing Sewer Main In Place
<br />LS
<br />-i
<br />$15,000'on
<br />$15,000.04
<br />Yes
<br />19
<br />Remove and otsposeaf Existing Sewer Manhole
<br />- BA
<br />11
<br />$2,500,00
<br />$27,500.00
<br />Yes
<br />20
<br />Remove And Replace Like -For -Like Existing Improvements Including But Not Llmlted To Curb And Gutter, PCC Slda Walk, Grass And
<br />LS
<br />1
<br />$80,000.00
<br />$80,000.00
<br />Yes
<br />Other LandscapEng
<br />21
<br />Abandon Existing Manhole, Remove The Top 16", Break Base Per Sid. Plan No. 1200 And Fill The Manhole Barrel With 1 Sack Slurry,
<br />EA
<br />2
<br />, $2 600.00
<br />$5,000.00
<br />Yes I
<br />Back Fill To The Natural Ground, Match Existing Finish Surface Salvage Manhole Cover And Frame To The City
<br />22
<br />Construct New Sewer Lateral Ta Back To Right Gf Way Connect rh Existing 4° VCP Lateral With Eccentric Reducer Couplings Per City
<br />LA
<br />B7
<br />$4,001100
<br />i $324,000A0
<br />Yes
<br />Std. Plan No. 1204
<br />23
<br />Construct Sewer Pipe Casing Per City Std. Plan No.1203. Replace Existing Median, Irrigation System, And Tree As Necessary
<br />-
<br />LF
<br />70
<br />$360 00
<br />$24,500.00
<br />Yes -
<br />24
<br />Clearing and Grubbing
<br />-
<br />; LS
<br />1
<br />, $20,000,00
<br />, $20,000.00
<br />Yes
<br />25I
<br />cold Mill Existing Pavement
<br />sF
<br />154000
<br />$0,3u
<br />$46,2tln,00
<br />Yes
<br />26
<br />Remove Existing and consircet AC Dig Out
<br />: SF
<br />400
<br />: $12.00
<br />- -
<br />: $4,800.00
<br />Yes
<br />-
<br />27
<br />-
<br />Construct 2' Asphalt Rubber Hot Mtx(ARHM)
<br />-
<br />TON
<br />1900
<br />$115.00
<br />$218,500,D0
<br />Yes
<br />28
<br />Sawcut, Remove and Construct PCC Pavement
<br />SF
<br />24600
<br />618,00
<br />$441,000.00
<br />Vag
<br />20
<br />Sawcm, Remove and Construct Curb Ramp
<br />EA
<br />2
<br />$6,500.00
<br />$17,000.00
<br />Yes
<br />30
<br />Sawcut, Remove and Construct Sidewalk
<br />SF
<br />2000
<br />_ $1400
<br />$28,000.00
<br />Yes
<br />31
<br />Sawcut B Remove and construct Curb and Gutter
<br />LF
<br />100
<br />$100.00
<br />$10,00B.0B
<br />Yes
<br />32
<br />Remove Existing and construct 6" Median Curb, Including 4" thick Fill in Concrete
<br />LS
<br />1
<br />$37,000.00
<br />$37,000.00
<br />Yes
<br />33
<br />Adjust to Grade Sewer Manhole
<br />-
<br />EA
<br />8
<br />9750.00
<br />$6,000.00
<br />Yes
<br />34
<br />Adjust to Grade Water Valve
<br />BA
<br />22
<br />$44u,0o
<br />$9,9co,no
<br />Yes
<br />35 -
<br />Adjust to Grade storm brain Manhole
<br />EA
<br />i
<br />$750.0o
<br />$750.00
<br />Yes
<br />36
<br />Install Traffic Signal Loops
<br />EA
<br />36
<br />$750.00
<br />$27,000.00
<br />Yes
<br />37 -
<br />Signing, Striping, MarkTngs & Pavement Legends
<br />LS
<br />1
<br />$18,000.00
<br />. $18,000.00
<br />Yes
<br />38
<br />Create planting & Irrigation Plan far Median at Station 46+50 to 48+75
<br />LS
<br />1
<br />- $23,000.00
<br />$23,000.00
<br />Yes
<br />39
<br />Planting Work for Median at Station 46+50 to 48+75
<br />LS
<br />1
<br />$30,000.00
<br />$30,000.00
<br />Yes
<br />4C
<br />Re-Establlsh 1' Irrigation Water Service for Median at Station 46+50 to 48+75
<br />LS
<br />1
<br />. $25,000,00
<br />$25,000.00
<br />Yea
<br />41
<br />Construction Permit
<br />LS
<br />1
<br />$15,000,00
<br />$is,aoo,00
<br />Yea
<br />42 -
<br />Import Rackfill Material end Illspase Native SoIW
<br />CY
<br />BOO
<br />$45.00
<br />$36,000.00
<br />Yes
<br />43
<br />Sewer Flow Level Monitoring & Alarming Device
<br />EA
<br />2
<br />$5,00000
<br />$10,000.00
<br />Yes
<br />44
<br />Sawcut, Remove and Construct PCC Bus Pad Per City Std. Plan No, 1108
<br />SF
<br />200
<br />$25.00
<br />$6,000.00
<br />Yes
<br />City Council
<br />PlanetBids lnc.
<br />21 — 13 12/7/2021