|
( Ni III .� E N 'Mi .� �,� �'�'� f IIY f "ii �" 'Mi III p �i III; iilK�' ..� III. f W, '.'° III f 'Mi
<br />��..!�..�� i� III III IIL)IIL. i�� � IIL. � i� L)�..�A'' III, III �,�..�� III il"�i, III L.� III, I� III i� III �..�� III, � � �!�..�� i� !�..�� III ,.,i !�..�� L.�� III IIL. III, i� ��..,,� IIL. � III �..�� III, i� III �
<br />�i IIY �i �INf
<br />.�"� w'll'"1A'I �ii,lil ��.w� ��ii',lil w'll'"1A'I ���� � �ii,lil w'll�.�,� � .'��I'"1A'I �� �ii',lil � � All :'�i� ��.w
<br />II�IIL..III�,III,. ....,...II�IIL.III�,.. ..111�,�111..11�IIL ..III,.. III ..IILIIL.�.. IIL�,.....,...III�,IIL.IIh. III�,IIL.,.III�,III..III.
<br />CUSTOMER NAME
<br />SANTA ANA, CITY OF
<br />Customer Number:
<br />3-000-0071-30
<br />Lamp Wattage
<br />Lamp Count
<br />Estimated
<br />High Pressure
<br />Sodium Vapor
<br />(HPSV)
<br />Annual Costs
<br />Estimated
<br />Light Emitting Diode
<br />(LED)
<br />Annual Costs
<br />Estimated Annual
<br />Savings
<br />60 Watt
<br />33
<br />$4,819
<br />$4,674
<br />$246
<br />70 Watt
<br />137
<br />$22,342
<br />$19,991
<br />$2,361
<br />100 Watt
<br />2,383
<br />$442,666
<br />$369,462
<br />$83,214
<br />160 Watt
<br />210
<br />$60,702
<br />$38,203
<br />$12,499
<br />200 Watt
<br />871
<br />$244,677
<br />$170,681
<br />$73,896
<br />260 Watt
<br />24
<br />$7,834
<br />$6,764
<br />$2,079
<br />310 Watt
<br />0
<br />$0
<br />$0
<br />$0
<br />400 Watt
<br />32
<br />$14,100
<br />$9,043
<br />$6,067
<br />Total
<br />3,690
<br />$787,041
<br />$607,698
<br />$179,342
<br />This analysis is provided to help you evaluate your current Southern California Edison (SCE) bill and/or compare your projected bills to other SCE
<br />rate options. These results are based on your past usage and/or assumptions about your energy usage and cannot be guaranteed by SCE. This rate
<br />analysis may not reflect all of the rate options that are available to you as an SCE customer. Your actual bills will vary from this analysis due to
<br />changes to your actual usage and assumptions such as operating hours, the equipment you use, kVAR charges, weather patterns, service voltage,
<br />firm service levels, taxes, and added facilities charges. Moreover, the rate options used in this analysis are subject to change by the California
<br />Public Utilities Commission (CPUC), which would also alter the outcome of this analysis.
<br />If your current rate schedule becomes unavailable — either by action of the CPUC or because you are no longer eligible to be placed on the rate —
<br />you will be notified of your rate options. If you do not select a different applicable rate option at that time, you will be placed on a default rate
<br />City Council
<br />25 — 9 12/7/2021
<br />SCE, Confidential HPSV Template_02.01.21.xlsx 4/29/2021
<br />
|