My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-12-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
AGENDA PACKET_2021-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:13:26 PM
Creation date
12/6/2021 5:43:05 PM
Metadata
Fields
Template:
City Clerk
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mg,, <br />Generation f Solar Power at Garthe and West Pump Station Facilities Project <br />Bureauf Reclamation Water Energy and Efficiency Grant F <br />Frcgure .2. Garthe and West Pump .Station Facilities Location Map <br />Legend <br />Gktrtho f*ai np 8tatfnar 7 J <br />w antf"umpStation r Orange Kfut`;)t,ieP <br />r_J city of Santa Ana Boundary <br />S. � <br />4F <br />sa rl" e Cot uty <br />Crew <br />Sarda Arsa <br />1j 'eh"l°nitph,'Q One <br />ake <br />r, ti�zm r <br />17, 4%f 3yMe .. <br />C. Techrdayl Project Descriptiori <br />The City of Santa Ana (City) currently purchases 18 million kilowatt hours (kWh) of <br />electricity each year to operate water well pumps and booster pumps to deliver potable <br />water to its customers. In February 2019, the City approved a "Water Systems Alternative <br />Energy Feasibility Study" ("NAM Study") prepared by Newcomb Anderson McCormick <br />(NAM), a Willdan Company (Appendix B). This Study included an evaluation of installing on - <br />site renewable energy systems to offset some of the City's electrical load, lower electric <br />bills, and reduce the associated greenhouse gas (GHG) emissions. The renewable energy <br />resources that were evaluated included installing solar photovoltaic (PV) modules at six <br />locations, including the Garthe and West pump station/reservoir facilities. <br />Preliminary designs were undertaken to determine the anticipated rate tariff, total system <br />size, annual performance projections, and relative load offset for each. The designs were <br />simulated using HelioScope, an industry standard PV simulation program that uses a local <br />weather data file and calculates the hourly performance of the system based on the angle <br />of insolation, air temperature, wind speed, intensity of clouds, etc. The hourly PV output is <br />subtracted from the hourly electric load profile data from SCE to determine the hourly <br />City Council <br />26 — <br />12 <br />12/7/2021 <br />2 <br />PREVIEW Date: Nov 03, 2021 <br />Workspace ID: <br />WS00800354 <br />Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.