|
Generation f Solar Power at Garthe and West Pump Station Facilities Project
<br />Bureau f Reclamation Water Energy and Efficiency Grant FY2022
<br />reduction in energy consumption in the City will result in reduced energy purchased
<br />from SCE, which will ultimately create more energy in the western energy grid.
<br />By eliminating the Garthe and West Pump Stations' need to purchase energy from SCE,
<br />there will be an additional 1,316,942 kWh per year of energy conserved on the western
<br />grid. As with all energy conservation efforts, the proposed Project will benefit municipal,
<br />industrial, environmental and recreation sectors, making more energy available to these
<br />sectors that are not yet able to produce renewable energy onsite. The project will
<br />benefit the overall environment by reducing greenhouse gas emissions, enhancing
<br />water reliability, and improving water management.
<br />l' p y
<br />..��r.�:°�'r.r u�rr��'�.r needs, � any, of the system.
<br />The proposed Project will not generate any water needs. In fact, the Project is expected
<br />to save in excess of 101.4 AFY of water on an annual basis by reducing reliance on fossil
<br />fuel consumptive energy.
<br />r y . aura mmm �'rf��°rr�;°er�r��r �° .. " . �r°��r�;°" " ..�rerly .. �c°r�r�, ��� � �;°r � . �m m m �r�',rr�r,
<br />Describe any energy qfficienciespectedsfrom implementation of the Water
<br />conservation or Water efficiency project (e.g., reduced pumping).
<br />WIf ray savings is expected to r'r".�swlt from the project-- please provide quantifiable r.�r�r".�r,
<br />sufficient supporting calculations. quantifying energy savings, ��'l�":"��,���":",���"ate
<br />�" ��°�r".r��° details .�� rrr�r' ,���r .:.:�'�r�°�r�,„ � ��N,. r.�r�r".�r,
<br />the estimated amount in lrihmratt hours per, year"
<br />As described in detail above, the results of the NAM Study determined that the
<br />estimated annual amount of energy that would be generated would be 894,325 kWh at
<br />the Garth site and 422,617 kWh for the West site, for a total of 1,316,942 kWh per year.
<br />ray efficiency " / ,r.''F�r lrr�rr�:°' �:°llrrrr'r
<br />0 l.'1����W Will t,'F�r���� r�.�r�er'��.� rf i�:°lr�.nc improvement �:°����mbat" ����, .
<br />changeincluding in,. an expected reduction in greenhouse
<br />By generating an estimated 1,316,942 kWh annually, the project is expected to reduce
<br />greenhouse gas emissions by the associated amount, thereby improving/offsetting the
<br />impacts of climate change in doing so.
<br />uIf. the project Will result' in reduced pumping, please describe the current, pumping
<br />requirements and the types of pumps (e.g., sir"r": currently r":ing used. HOW WOuld the
<br />proposed project, impact, the current, pumping requirements and energy usage,`
<br />By generating over 101.4 AFY of water savings, the need for pumping an equivalent
<br />City Council 26 — 18 12/7/2021
<br />8
<br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023
<br />
|