Laserfiche WebLink
Generation f Solar Power at Garthe and West Pump Station Facilities Project <br />Bureau f Reclamation Water Energy and Efficiency Grant 6 <br />Water Resources Control Board over an emergency drought order issued in August <br />2021 to curtail water diversions. <br />The City of Santa Ana is one of MWD's 26 member -agencies (including 14 cities, 11 <br />municipal water districts, and one county water authority). Implementation of the <br />proposed project will help ensure the City serves as a responsible member by <br />reducing its dependence on the finite supply from MWD, thereby supporting water <br />supply reliability during times of drought. Project implementation will also help <br />prepare for projected increases in water demands, making water available for <br />multiple beneficial uses and help to resolve or prevent water related conflicts in the <br />region. <br />1A. Evaluation Criterion D—On-Farm Irrigation improvements <br />Not applicable. <br />D.5. Evaluation CriterionI iImplementation <br />.. <br />mm1 Subcriterion gym1................ f reVr*ct Plannin,il,l <br />Does the applicant have a Water Conservation f1lan andlor System Optimization Relliew (50R) in <br />place'2 Does� the project address an adaptation strategy identified in a completed WaterSMART <br />Basin Study', f1lease self -certify or provide copies� of these plans Where appropriate to verify that <br />such a plan is in place. Including a specific excerpt or a link to the planning document may als o <br />be considered Where appropriate. <br />The City of Santa Ana maintains a Water Shortage Contingency Plan (WSCP) (Appendix C) which <br />identifies a number of water conservation methods to be instated in response to water <br />shortages. By implementing solar power generation at the Garthe and West Pump Station <br />facilities, the City will be able to provide reliable water supplies even in the event of a water <br />shortage, which would threaten water and energy resources. <br />The City of Santa Ana has a Climate Action Plan (Appendix A). The Project does address an <br />adaptation strategy identified in the September 2013, U.S. Department of Interior Bureau of <br />Reclamation Summary Report for the „inta,,,, ina Wa�.,,e„iirvs,lhed 1 „s,i%,ii�,, ,t. u,d , which includes the City <br />of Santa Ana. One of the adaptation strategies identified was AB 32 compliance: "....identify <br />additional opportunities for reducing carbon emissions." (Section 4.6 states that climate <br />adaptation strategies were developed through a consultative process involving reclamation and <br />SAWPA staff.) The proposed Project will generate renewable (solar) energy in lieu of electrical <br />power, thus reducing the carbon emissions. In doing so, the Project addresses this adaptation <br />strategy specifically identified in the completed Watersmart Basin Study. <br />f1rovide the fOlkAAling information regarding project, planning <br />City Council 26 — 30 12/7/2021 <br />20 <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />