Laserfiche WebLink
9 <br />One Connection Point, SA-1, has a hydro turbine to generate electricity with some of this pressure differential. <br />Its operation will be discussed later in the report. The design capacity of these 7 connections is 87 million <br />gallons per day, but they are typically operated at lower flow rates. <br />11 11:..:.VA <br />„rid lie s <br />The city has relatively little change in elevation and the water is maintained in one distribution system for the <br />main zone, more or less at the same pressure and elevation throughout most of the city. The analysis will <br />assume that the small differences in elevation do not affect the performance of the systems. <br />3.7 s <br />The Agency also operates two wastewater lift stations to deliver it to the regional treatment plant, although <br />these are a small fraction of the annual electrical use. <br />p W a:, urr ll�iV Cou.in ,�l '011um�ii�: " <br />26 — 65 <br />11�11 12 11� 11'A MIN A <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />