Laserfiche WebLink
12 Job No. 2669.01 EE�I' y Ern ftE� ri 'UVEV DM.IIEI li' y F:::E�asibflity Study <br />In the evaluation of hydro turbines to make electricity from the excess pressure, this suggests that the efficiency <br />at this design flow is important, but the partial flow efficiency is not critical. <br />The monetary benefits for this project will be calculated according to the SCE rate schedules that are used for <br />each account. When a unit operated, say 23% of the hours in a month, it will be assumed that this implies it <br />operates 23% of the On Peak hours, 23% of the Mid Peak hours and 23% of the Off Peak hours. A demand <br />savings for a given month is only be included if the unit operates at least 95% of the hours that month to keep <br />the savings fairly conservative. <br />The historical flow data is converted into anticipated full load operating hours per month for each MWD <br />connection in the following table. <br />1, <br />MWID <br />Connection <br />The following table shows the total water flow in 2017 by connection point. Note that three connection points, <br />SA-1, SA-3 and SA-6 represent 91% of all the MWD flow for the year. These three stations will be investigated <br />for the potential to generate power from this water flow. <br />191,384,600 <br />:00 <br />••. <br />00 <br />.•. <br />255,544,800 <br />19,225,600 <br />619,844,100 <br />MINSMIU11 <br />26 — 72 Newcoirrib I 12)VI iON ?JcCoiri6dk <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />