My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-12-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
AGENDA PACKET_2021-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:13:26 PM
Creation date
12/6/2021 5:43:05 PM
Metadata
Fields
Template:
City Clerk
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6: POTENTIAL FOR HEAD RECOVERY AT MWD CONNECTIONS 21 <br />1 ft3 �aP'Sec 2,4 leis �i„7� kW ,sec 178. 550 aft 1bs, 8'.3,S aaa c h = 143 ;ta 7 <br />This assumes the same mechanical efficiency as found for the 12-inch turbine for the 8 CFS flow rate. This <br />turbine is likely to be a 14 or 16-inch unit. <br />In the case of SA-6, the anticipated full load hours of operation are expected to be 5,915 hours per year, so the <br />anticipated energy generation is 845,901 kWh per year. <br />The monetary value for this electricity based on the RES-BCT arrangement with the Generation portion of TOU- <br />GS-1-LG rate schedule is $55,131 per year. The value of the generated electricity is approximately $0.065 per <br />kWh. <br />Should the City sign up with SCE through the NEMA program, the electricity would be worth approximately <br />$0.145 per kWh, more than double the RES-BCT savings. The City would need to enter discussions with SCE and <br />possibly apply for an interconnection to determine which rate will apply to this project. <br />The projected cost to purchase and install the new hydro -turbine is $1,072,174. This involves the purchase of <br />the new turbine generator set with electrical panel and controls, the construction of a new vault below the <br />sidewalk to house the turbine and switchgear, the connection with SCE including a new transformer to accept <br />the power, and integration with the existing SCADA controls. <br />°Ie�W�coin�ll,9 ,(JCisur°in �f�,�C('0u,u.m�ii�: " 26 — 81 G II�II 112 11�.11 N <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.