My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-12-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
AGENDA PACKET_2021-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:13:26 PM
Creation date
12/6/2021 5:43:05 PM
Metadata
Fields
Template:
City Clerk
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
projects proceed smoothly and on time with the minimum of project management and/or engineering <br />design/consultancy services. <br />In our experience it is always better to design for, rather than close our minds to, possible failure <br />modes. We therefore accept that it is necessary for turbines to reach full run -away speed safely and <br />have generators supplied to us tested at full run -away speed to ensure that no damage will occur. <br />Some suppliers use lower cost generators which will handle 130% or 140% of normal speed and hope <br />to be able to shut their turbines down before the turbine has accelerated to full run -away and accept <br />that if the machine does ever reach full run -away the generator will be damaged. Gilkes experience is <br />that full run -away is usually reached in less than 5 seconds and is therefore extremely difficult to avoid. <br />IdOLKE15 26 - 129 12/7/2021 <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.