My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-12-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
AGENDA PACKET_2021-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 8:23:11 AM
Creation date
12/17/2021 1:35:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT A <br />PROPOSAL <br />RITCHEY ST WATER MAIN RELOCATION, PROJECT NO. 19-6438 <br />SA-7 PRESSURE REDUCING STATION RELOCATION, PROJECT NO. 19-6439 <br />SR-55 WATER CROSSING RELOCATION, PROJECT NO. 19-6440 <br />FED ID NO. STPLN-6071 (129) <br />BID SCHEDULE `B" <br />SA-7 PRESSURE REDUCING RELOCATION, PROJECT NO.19-6439 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1. * <br />Mobilization/Demobilization <br />l <br />LS <br />S <br />$ <br />2' <br />Sheeting, Shoring, Bracing and <br />Excavation/Trench Protection <br />1 <br />LS <br />$ <br />$ <br />3' <br />Construct New SA7 Valves, Piping, <br />Fittings, and Appurtenances <br />1 <br />LS <br />$ <br />$ <br />4. <br />Construct 24-inch Piping, Valves and <br />Fittings to Connection to Existing 24- <br />inch Water Main <br />1 <br />LS <br />$ <br />$ <br />5. <br />Construct Concrete Anchor Block <br />I <br />LS <br />$ <br />$ <br />6' <br />Construct New Energy Dissipator <br />Facility <br />I <br />LS <br />$ <br />$ <br />7. <br />Construct Phase 1 Site Improvements <br />1 <br />LS <br />$ <br />$ <br />8. <br />Construct Phase 2 Site Improvements <br />1 <br />LS <br />$ <br />$ <br />9. <br />Demolition of Existing SA 7 Facility <br />1 <br />LS <br />$ <br />$ <br />10. <br />Furnish and Install Electrical <br />Equipment and Facilities <br />I <br />LS <br />$ <br />$ <br />11. <br />Furnish and Install Instrumentation <br />and Control Equipment and Facilities <br />including Pro ramin <br />1 <br />LS <br />$ <br />$ <br />12. <br />Construct Landscape and Irrigation <br />Improvements <br />I <br />LS <br />$ <br />$ <br />13. <br />Construction Staking <br />I <br />LS <br />$ <br />$ <br />14. <br />Start-up, Testing and Training <br />I <br />LS <br />$ <br />$ <br />15. <br />O&M Manuals and Warranties <br />I <br />LS <br />$ <br />$ <br />16. <br />Permits (Allowance) <br />1 <br />LS <br />$ 10,000 <br />$ 10,000 <br />17. <br />As-Builts <br />1 <br />LS <br />$ 10,000 <br />$ 10,000 <br />P-3 of P-21 <br /> <br />City Council <br /> 24 – 16 <br />12/21 /2021 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.