Laserfiche WebLink
Federally Required Documents to be Submitted with Your Bid Proposal <br />Packet and Prior to the Award of Contract <br />Specific federal requirements must be met for this U.S. Department of Housing and Urban Development <br />(HUD) funded project. <br />The City of Santa Ana's Contact: <br />Community Development Agency <br />City of Santa Ana <br />20 Civic Center Plaza, M-25 <br />Santa Ana, CA 92701 <br />Phone (714) 647-5445 Fax (714)647-6549 <br />www.santa-ano.orW <br />fLi7 Y1l7aTt-&kYt1:It)xow0laww I�t IE ItI;IZil11I Ialut <br />The following documents) MUST be fully filled out and submitted with the bid proposal naelca¢e: <br />r <br />• Proof of registration in the System for Award Management (www am.oy) to be filed by contractor <br />• Proof of registration in the D&B Data Universal Numbering System <br />fhttosZUMdate.dn&comdUndaL4k=,2ar}vlo kun.hnn <br />• Section 3 Contract Clause (Exhibit 1). To be filed by contractor. <br />• New Hire Calculation Form (Exhibit 2). To be filed by contractor. <br />• Contractor's Section 3 Affirmative Action Plan (Exhibit 8). To be filed by contractor. <br />• Section 3 Contract Award Considerations (Exhibit 9). To be fited by contractor. <br />• Women/Minority Business Owned Enterprises Good Faith Efforts (Exhibit 12). To be filed by <br />contractor. <br />• Noncollusion Affidavit (Exhibit 15). To be filed by contractor. <br />• Federal Lobbyist Requirements Certification: (Exhibit 16). To be filed by contractor. <br />• Certification and Understanding ofAuthorizadon (Exhibit 17). To be filed by contractor and <br />subcontractor(s). <br />• * Additional Wage Rate Classification.* If the contractor needs an additional job classification, the <br />contractor must submit with the bid package a written, signed request naming the work <br />classification(s) and the wage rate(s), including any fringe benefits that are proposed. <br />The following document(s) shall be completed by the contractor and/or subcontractor(s), as specified, and <br />filed with the City's Labor/Section 3 Contact prior to award of contract on the project: <br />Proof of registration in the System for Award Management (www.smn.eo) to be filed by <br />subcontractor(s) <br />• Section 3 Contract Clause (Exhibit 1). To be filed by subcontractor <br />• Project Wage Rate Sheet. To be filed by contractor and any subcontractor(s). <br />