My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JAMES W. FOWLER CO. (SR-55/RITCHEY WATER MAIN IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
JAMES W. FOWLER CO. (SR-55/RITCHEY WATER MAIN IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 2:14:59 PM
Creation date
1/3/2022 10:28:12 AM
Metadata
Fields
Template:
Contracts
Company Name
JAMES W. FOWLER CO. (SR-55/RITCHEY WATER MAIN IMPROVEMENTS)
Contract #
P19-6437, 19-6439
Agency
Public Works
Council Approval Date
12/21/2021
Notes
19-6440
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT A <br />PROPOSAL <br />RITCHEY ST WATER MAIN RELOCATION, PROJECT NO, 19-6438 <br />SA-7 PRESSURE REDUCING STATION RELOCATION, PROJECT NO, 19-6439 <br />SR-55 WATER CROSSING RELOCATION, PROJECT NO. 19-6440 <br />FED ID NO. STPLN-6071 (129) <br />Item <br />Description <br />QtY <br />Unit <br />Unit Price <br />Amount <br />13. <br />2-Inch Combination Air Valve <br />I <br />EA <br />$ 15,000 <br />$ 15,000.00 <br />14. <br />Construct Concrete Encasement <br />84 <br />LF <br />$ 300 <br />$ 25,200.00 <br />I5. <br />Connections to Existing 8'716" Mains <br />3 <br />EA <br />$ 20,000 <br />$ 60,000.00 <br />16. <br />Abandonment of Flange Outlets on <br />Existing 24-inch Water Main <br />2 <br />EA <br />$ 1,500 <br />$ 3,000.00 <br />17 <br />Abandonment of 1'72" Services on <br />Existing 24-inch Water Main <br />3 <br />EA <br />$ 4,000 <br />$ 12,000.00 <br />18 <br />Abandonment of Existing 1'72" <br />Services <br />9 <br />EA <br />$ 2,500 <br />$ 22,500.00 <br />19 <br />Hydrant <br />4 <br />Ep <br />$ 7,500 <br />$ 30,000.00 <br />20 <br />Abandonment of Existing 24-inch <br />Water Main (Fi 11 with Slurry) <br />1 <br />LS <br />$ 7,500 <br />$ 7,500.00 <br />21. <br />Abandonment of Existing 16-inch <br />Water Main (including Fi 11 with <br />SluEy and No Slurry) <br />I <br />LS <br />$ 8,500 <br />$ 8,500.00 <br />22. <br />Potholing <br />I <br />LS <br />$ 15,000 <br />$ 15,000.00 <br />23, <br />Signing and Striping <br />1 <br />LS <br />$ 10,000 <br />$ 10,000.00 <br />24' <br />Prepare and Obtain Approval of <br />Traffic Control Plans <br />I <br />LS <br />$ 1,000 <br />$ 1,000.00 <br />25. <br />Provide and Maintain Traffic Control <br />I <br />LS <br />$ 65,000 <br />$ 65,000.00 <br />26. <br />Construction Staking <br />1 <br />LS <br />$ 29,000 <br />$ 29,000,00 <br />27 <br />Remove and Replace Curb, Gutter, <br />and Sidewalk <br />l <br />LS <br />$ 55,000 <br />$ 55,000.00 <br />28.** <br />Over -Excavation and Import Backfill <br />Material <br />100 <br />CY <br />$ 450 <br />$ 45,000.00 <br />29. <br />Permits (Allowance) <br />1 <br />LS <br />$ 10,000 <br />$ 10,000 <br />30. <br />As-Builts <br />1 <br />LS <br />$ 10,000 <br />$ 10,000 <br />BID ITEMS 1— 30 TOTAL BID SCHEDULE "A" $ 1,476,100.00 <br />P-2 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.