My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JAMES W. FOWLER CO. (SR-55/RITCHEY WATER MAIN IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
JAMES W. FOWLER CO. (SR-55/RITCHEY WATER MAIN IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 2:14:59 PM
Creation date
1/3/2022 10:28:12 AM
Metadata
Fields
Template:
Contracts
Company Name
JAMES W. FOWLER CO. (SR-55/RITCHEY WATER MAIN IMPROVEMENTS)
Contract #
P19-6437, 19-6439
Agency
Public Works
Council Approval Date
12/21/2021
Notes
19-6440
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT A <br />PROPOSAL <br />RITCHEY ST WATER MAIN RELOCATION, PROJECT NO. 19-6438 <br />SA-7 PRESSURE REDUCING STATION RELOCATION, PROJECT NO. 19-6439 <br />SR-55 WATER CROSSING RELOCATION, PROJECT NO. 19-6440 <br />FED ID NO. STPLN-6071 (129) <br />BID ITEMS 1-17 TOTAL BID SCHEDULE "B" $ 2,281,600.00 <br />BID SCHEDULE "C" <br />SR-55 WATER CROSSING RELOCATION, PROJECT NO.19-6440 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1. * <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 100,000 <br />$ 100,000.00 <br />2 <br />Sheeting, Shoring, Bracing and <br />l <br />LS <br />$ 10,000 <br />$ 10,000.00 <br />Excavation/Trench Protection <br />3. <br />12-Inch C900 PVC Pipe, DR-14 <br />102 <br />LF <br />$ 350 <br />$ 35,700.00 <br />4. <br />12-Inch Class 350 DIP <br />77 <br />LF <br />$ 300 <br />$ 23,100.00 <br />5. <br />24-inch CML&C Steel Pipe <br />137 <br />LF <br />$ 1,725.00 <br />$ 1,725.00 <br />6 <br />Bore and Jack 12-Inch Carrier Pipe <br />249 <br />LF <br />$ <br />$ <br />within 30-inch Steel Casing <br />2,200 <br />547,800.00 <br />7 <br />Bore and Jack 24-Inch Carrier Pipe <br />within 42-inch Steel Casing <br />249 <br />LF <br />$ 2,700 <br />$ 672,300.00 <br />8. <br />12-Inch Gate Valve <br />2 <br />EA <br />$ 6,000 <br />$ 12,000.00 <br />9. <br />24-Inch Butterfly Valve, Class 350 <br />1 <br />EA <br />$ <br />$ <br />35,000 <br />35,000.00 <br />10 <br />3-inch Fiber Optic Conduits and Pull <br />I <br />LS <br />$ <br />$ <br />Boxes <br />5,000 <br />5,000.00 <br />11, <br />Construct Concrete Encasement <br />57 <br />LF <br />$ 300 <br />$ 17,100.00 <br />12, <br />Construct Concrete Anchor Block <br />2 <br />EA <br />$ <br />$ <br />20,000 <br />40,000.00 <br />13. <br />Connections to Existing 12"/24" <br />2 <br />EA <br />$ <br />$ <br />Mains <br />25,000 <br />50,000.00 <br />Remove and Replace 21-inch Storm <br />14. <br />Drain Piping including Temporary <br />1 <br />LS <br />50,000 <br />$ <br />50,000.00 <br />$ <br />Piping Facilities <br />Abandonment of Existing 24-inch <br />15. <br />Water Main and 30-inch Casing <br />1 <br />LS <br />$ 15,000 <br />$ 15,000,00 <br />Crossing SR 55 Fi 11 with Slurry) <br />Abandonment of Existing I2-inch <br />16. <br />Water Main and 20-inch Casing <br />1 <br />LS <br />$ 10,000 <br />$ 10,000.00 <br />CrossingSR 55 Fill with Slu <br />P-4 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.