My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREAT AMERICAN INSURANCE GROUP (HYM ENGINEERING) (SANTA ANA ZOO GIANT RIVER OTTER & PRIMATE TRAILS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GREAT AMERICAN INSURANCE GROUP (HYM ENGINEERING) (SANTA ANA ZOO GIANT RIVER OTTER & PRIMATE TRAILS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 9:36:01 AM
Creation date
1/20/2022 9:23:50 AM
Metadata
Fields
Template:
Contracts
Company Name
GREAT AMERICAN INSURANCE GROUP (HYM ENGINEERING)
Contract #
P 16-2658
Agency
Public Works
Council Approval Date
11/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Additional rockwork overhang between the Otter Pool and the View Shelter requested by the <br /> City per PCO #27 dated April 18, 2024. <br /> TOTAL AGREED PRICE = $10,425.66 <br /> 7. Additional time and material water line work to cut and cap, repair, and reroute different water <br /> lines within the project limits per PCO #23, 24, 26 dated April 11, 2024. <br /> TOTAL AGREED PRICE= $4,755.18 <br /> 8. City requested the contractor to widen holding building footing to properly slope the floor for <br /> a level door per PCO #25 dated April 11, 2024. <br /> TOTAL AGREED PRICE=$1,823.81 <br /> 9. City requested the contractor to cover the exposed bolts at the viewing windows with polygem <br /> per PCO #28 dated April 2, 2024. <br /> TOTAL AGREED PRICE=$789.37 <br /> 10.Additional work to increase the diameter of six caisson foundations to avoid conflicts. <br /> Additional concrete, excavation, and hauling needed per PCO #29 dated February 28, 2024. <br /> TOTAL AGREED PRICE=$4,397.82 <br /> 11.To compensate the contractor for additional rockwork in the 6x6 steel columns in the <br /> Underwater View Structure per PCO #31 dated April 22, 2024. <br /> TOTAL AGREED PRICE =$9,751.38 <br /> TOTAL CHANGE ORDER PRICE = $257,222.82 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.