My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-02-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/01/2022 Special and Regular & HA
>
Agenda Packet_2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 11:32:04 AM
Creation date
1/28/2022 11:12:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/1/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
738
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE <br />SAFETY SYSTEMS <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. L2GLE IN THIS CONTRACT 14. YEAKb tAHt KItNL:t <br />Dispatcher / Project Manager C. TOTAL d. WITH CURRENT FIRM <br />29 9 <br />15. FIRM NAME AND LOCATION (City and State) <br />Statewide Traffic Safety and Signs, Inc. — Santa Ana Branch <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />N/A I N/A <br />ly. KtLtVANI t MUJCL. 0 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />N/A Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ® Check if project performed with current firm <br />a Dispatcher / Project Manager for Statewide out or Santa Ana branch which services Los Angeles and Orange Counties of California. <br />Dispatch and coordinate labor, material and equipment for projects relating to construction area signs, traffic design, traffic control, traffic <br />detours, temporary and permanent signage, crash attenuation, and work zone safety. <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />N/A 2017-2020 <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ®Check if project performed with current firm <br />Dispatcher / Project Manager <br />On -Call Traffic Control Contract <br />YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />N/A 2018-2019, 2020 — <br />Current Contract <br />c• (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Dispatcher / Project Manager <br />On -Call Traffic Control Contract <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION(Ifapplicable) <br />N/A 2016 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />d. Dispatcher / Project Manager <br />Work included managed traffic control, construction area signs, crash arrays, temporary and permanent signage, overhead signs and <br />structures, and rentals & sales of traffic control and safety equipment. <br />Project widened the 1-405 through the Sepulveda pass from 1-10 to US Route 101, and overall construction cost was >$1 billion. Statewide <br />portion of work was roughly $55 million. <br />(2) YEAR COMPLETED <br />4L SERVICES CONSTRUCTION (If applicable) <br />N/A 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ® Check if project performed with current firm <br />e. <br />Dispatcher / Project Manager <br />Work includes permanent roadside signs, PCBM's (permanent concrete barrier markers), and Class 1 Delineators. <br />Overall construction valued at — $318 million; Statewide subcontracted for — $119K. <br />1n/�-11y (/�./� /� 5Cal:-. i,i!G` Ti"a"r Salt c:. �ii ir;� IJ-=�'rw`�^(. 1/(�7��. Sd('_V sy'_l <br />Sty].R �l tlrll .i�J J 1V�I 1 1,Wl 11W1 <br />t�c v�lu,i ii3lhl:�.- 1�I:_`r,ll[c �'�)I�V11 �PXiI t C�IOf / <?5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.