Laserfiche WebLink
and/or functional specifications. The Contractor shall be capable of providing panel building <br />services consisting of the following components: <br />1. Motor control centers (MCCs) <br />2. Remote terminal unit (RTU) control panels <br />3. Human machine interfaces (HMIs) <br />4. Programmable logic computers (PLCs) <br />5. Variable frequent drives (VFD) <br />6. Motor operated valves (MOV) <br />7. Magnetic flowmeters (various brands) <br />8. Radio and communications equipment <br />9. Other related appurtenances <br />Prior to the commencement of panel building services, the Contractor shall assess the <br />project and provide a submittal to the City containing proposed equipment and components <br />as well as a project schedule for the construction of the panels. The Contractor shall <br />provide separate quotes, which shall be approved by the City's Project Manager prior to the <br />commencement of work with a clearly established scope and timeline parameters. After <br />receiving the City's Notice to Proceed, the Contractor shall begin the procurement of all <br />equipment and materials associated with the construction of the new control panel. The <br />Contractor shall inform the City of any long lead times that may affect project deadlines and <br />the overall construction schedule. In addition and upon request by the City, the Contractor <br />shall also repair and retrofit existing panels per the City's specifications and adhering to <br />codes and regulations. <br />2. FACTORY ACCEPTANCE TEST <br />The Contractor shall provide quality assurance and quality control through factory <br />acceptance testing (FAT) on all constructed industrial control panels. The initial un- <br />witnessed FAT procedures shall be performed by the Contractor's Test Engineer internally, <br />and all self -identified non -conformances shall be rectified by the Contractor. Once all self - <br />identified non -conformances are rectified, the final witnessed FAT procedures shall be <br />overseen by a City Representative and performed by the Contractor's Test Engineer. The <br />Contractor's Test Engineers shall be responsible for recording items checked and non - <br />conformances. The following panel components shall be verified by the Contractor and City <br />Representative during the FAT when applicable: <br />1. Panel Components and Mounting: <br />a. The Contractor shall verify the panel assembly and the interior/exterior layout <br />with the design. <br />b, The Contractor shall confirm the enclosure mechanical components match <br />the design and operate as specified (includes door latches, door closed <br />switches, door stops, laptop shelf, disconnect handles, etc.), <br />c. The Contractor shall confirm the spacing requirements of components and <br />accessibility are met for panel installation and maintenance purposes (per <br />design specifications). <br />d. Heat vents, exhausts, fans, and dissipation areas of all applicable <br />components shall be checked in addition to wires, devices, and shipping <br />City of Santa Ana - RFP 21-100 <br />Water Resources Panel Building Services <br />Page 15 of 39 <br />