My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KDC SYSTEMS (2)
Clerk
>
Contracts / Agreements
>
K
>
KDC SYSTEMS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 4:42:57 PM
Creation date
2/14/2022 2:31:21 PM
Metadata
Fields
Template:
Contracts
Company Name
KDC SYSTEMS
Contract #
A-2022-009-01
Agency
Public Works
Council Approval Date
1/18/2022
Expiration Date
1/17/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KDC Systems <br />An EMCOR Company <br />1. AGREEMENT STATEMENT................................................................................................6 <br />2. FIRM AND TEAM EXPERIENCE.......................................................................................... <br />6 <br />2.1. Services...........................................................................................................................6 <br />2.2. Key Personnel.................................................................................................................8 <br />2.3. Panel Fabrication............................................................................................................8 <br />2.4. Training Room................................................................................................................9 <br />2.5. Factory Acceptance Testing & Metrology Lab..............................................................10 <br />2.6. On Going Support.........................................................................................................10 <br />3. UNDERSTANDING SCOPE OF SERVICES........................................................................... 11 <br />3.1. Panel Building Services.................................................................................................11 <br />3.2. Factory Acceptance Test...............................................................................................11 <br />3.3. Post -Installation Field Testing.......................................................................................12 <br />3.4. Panel Design Services...................................................................................................12 <br />4. RELEVANT PROJECT EXPERIENCE.................................................................................... <br />13 <br />4.1. IRWD, Baker Water Treatment Facility.........................................................................13 <br />4.2. IRWD, Michelson Water Recycling Plant, Biosolids.......................................................14 <br />andEnergy Recovery...............................................................................................................14 <br />4.3. Orange County Water District, Advanced Water Treatment Facility ............................15 <br />4.4. Los Angeles World Airports, LAX Central Utilities.........................................................17 <br />PlantUpgrade..........................................................................................................................17 <br />4.5. City of Santa Ana - Various Projects..............................................................................18 <br />Well 21, South Station Well Integration, Wells 16&33............................................................18 <br />Control Panels, SA-5 Vault Modifications, Walnut...................................................................18 <br />Pump Station, Cambridge Bypass, Santa Ana SA-7 Radio Repeater Panels & Well 20 Meter <br />Integration...............................................................................................................................18 <br />S. REFERENCES...................................................................................................................18 <br />Page 4 <br />�_ - KDC Systems <br />An EMCOR Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.