Laserfiche WebLink
& <br />y <br />IT PIT, <br />3W <br />.QS <br />®R <br />tip <br />7i <br />Mariposa Park. Completed in 2019, the 0.43-acre neighborhood park includes a vibrant playground, a 2,SOO-square- <br />foot skate bowl, picnic benches, areas with shade, a rock bioswale, and water -wise landscaping. The site wasformerly <br />three vacant homes, which were acquired by the City of Santa Ana, demolished, and redeveloped as open space to <br />provide more outdoor recreation opportunities for the Lacy Neighborhood community. <br />