My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Santa Ana General Plan Binder
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Santa Ana General Plan Binder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 9:58:29 AM
Creation date
2/16/2022 9:46:02 AM
Metadata
Fields
Template:
City Clerk
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />_C <br />p <br />!d 3 <br />gas <br />ti <br />-¢sue - �f`£ 4 - \✓ �-.. <br />Y' CSLJ4'S XX�w . <br />•( <br />/ / LA <br />..L.e <br />-P \ <br />Mabury Park Stormwater Project. Completed in 2019, the project included the construction of a 7,000-square- <br />_ foot bioretention basin designed to capture and infiltrate approximately 27,000 cubic feet of stormwater during a <br />significant storm. The bioretention basin will capture stormwater runoff and use natural filtering through the soil to <br />" remove pollutants before itis released into the City's storm drain system. This project was thefirst regional stormwater <br />infiltration best management practice (aka BMP) in the City of Santa Ana. <br />AL , <br />NZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.