Laserfiche WebLink
f <br />_C <br />p <br />!d 3 <br />gas <br />ti <br />-¢sue - �f`£ 4 - \✓ �-.. <br />Y' CSLJ4'S XX�w . <br />•( <br />/ / LA <br />..L.e <br />-P \ <br />Mabury Park Stormwater Project. Completed in 2019, the project included the construction of a 7,000-square- <br />_ foot bioretention basin designed to capture and infiltrate approximately 27,000 cubic feet of stormwater during a <br />significant storm. The bioretention basin will capture stormwater runoff and use natural filtering through the soil to <br />" remove pollutants before itis released into the City's storm drain system. This project was thefirst regional stormwater <br />infiltration best management practice (aka BMP) in the City of Santa Ana. <br />AL , <br />NZ <br />