My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - Non-Agenda
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
03/01/2022 Regular
>
CORRESPONDENCE - Non-Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 9:12:17 AM
Creation date
3/1/2022 8:59:35 AM
Metadata
Fields
Template:
City Clerk
Date
3/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
forth teens governing the constriction of the NEW SHELTER and the allocation <br /> among the PARTIES, and the method of payment of, the increased costs of <br /> SERVICES resulting from the construction of the NEW SHELTER. <br /> i <br /> NOW, THEREFORE, in consideration of the foregoing recitals of fact, the mutual { <br /> covenants and conditions contained herein and other consideration, the value and { <br /> adequacy of which are hereby acknowledged, the PARTIES agree as follows: <br /> 1. Design & Construct <br /> i <br /> i <br /> 1.1. COUNTY Responsibilities: COUNTY shall be responsible for the design; <br /> preparation of all studies, analyses and documents necessary to deliver the NEW <br /> SHELTER, including any CEQA environmental documentation; obtaining all <br /> permits; administration; and construction of the NEW SHELTER. <br /> 1.2. Site: Construction of the NEW SHELTER is sited for the 10 acre area of land <br /> on the Old Tustin Air Force Base located at the 1500 block of Armstrong <br /> i <br /> Avenue in Tustin, CA and identified on Exhibit A, attached hereto (the "SITE"). <br /> k <br /> I <br /> 1.3. Design Concept: COUNTY has developed the initial design concept of the <br /> NEW SHELTER, attached hereto as Exhibit B. The design of the NEW <br /> SHELTER is scalable based on usage needs. COUNTY shall use best efforts to <br /> scale the final design of the NEW SHELTER to a size reasonably appropriate i <br /> for the total requirements of those CITIES that elect to be parties to this <br /> AGREEMENT. i <br /> E <br /> 1.4. Project Development: COUNTY has or shall retain the services of a licensed <br /> design-build contractor("CONTRACTOR") to perform further design and all <br /> engineering, planning, preparation of plans and specifications, and complete <br /> construction of the NEW SHELTER, including construction management and <br /> post-construction activities, pursuant to a written agreement between COUNTY <br /> and CONTRACTOR, as the same may be amended from time to time (the <br /> "CONSTRUCTION CONTRACT"). <br /> 1.5. Design Advisory Board: COUNTY shall establish a Design Advisory Board <br /> (the"DESIGN ADVISORY BOARD") to provide input to COUNTY regarding <br /> the design of the NEW SHELTER. COUNTY shall, in good faith, reasonably <br /> consider the input of the DESIGN ADVISORY BOARD in making <br /> COUNTY'S determinations regarding the design of the NEW SHELTER. <br /> 2 <br /> 25C-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.