Laserfiche WebLink
Exhibit C <br /> i <br /> Mr. Scott Mayer <br /> County of Orange <br /> December 15, 2015, Page 6 <br /> E <br /> acknowledge that the design of the Common Driveway shall be subject to approval by the Division <br /> of State Architect. <br /> i <br /> (ii) De signs The parties agree to cooperate to agree upon the design of the j <br /> Common Access Point and the Common Driveway as soon as practicable so as not to delay the <br /> City's schedule for the construction of Bell Avenue. <br /> (iii) Site .Plan, Attached hereto as Exhibit B is a Conceptual Site Plan for the <br /> Center showing the approximate location of the Common Access Point and the Common <br /> Driveway, County;shall submit to SOCCCD a relined Site Plan for the Center for review prior to <br /> commencement of construction pursuant to .Paragraph 3(a) above. <br /> (iv) Recipracal Easement Agreement. The Parties shall enter into a Reciprocal <br /> Easement Agreement ("REA") concerning the Common Driveway, which shall be recorded <br /> against the SOCCCD Exchange Parcel and Contiguous Parcel by the escrow holder upon the <br /> Closing. The REA shall provide for the use of the Common Driveway for ingress and egress to <br /> both the SOCCCD Exchange Parcel and the Contiguous Parcel, for the maintenance thereof and <br /> for the sharing of costs of such maintenance between the yawners of the two parcels, The ILEA <br /> shall forbid.County to use the Common Driveway for any purpose other than public access to the <br /> Center. <br /> I <br /> (v) Other Cq�Lnty Aces Points to Bell Avenue. Counter shall be solely � <br /> responsible for all costs of the design and construction of all access lanes, curb cuts and other <br /> improvements required to provide access to Bell Avenue from the SOCCCD Exchange Parcel <br /> other than the Common Access Point and the Common Driveway. <br /> (c) TLips. SOCCCD has previously obtained from the City a determination of the <br /> average daily trips("ADTs")assigned to the ATEP Site. County shall be responsible for obtaining <br /> a determination from the City of the number of ADT's that will be assigned to the SOCCCD <br /> .Exchange Parcel and County shall make its own determination whether that number is adequate <br /> for the use and operation of the Center. To the extent required by the City, the County will cause <br /> the level of service to be analyzed by a traffic engineer and approved by the City prior to the <br /> issuance of any development permits or approvals by the City, which traffic analysis will assume <br /> that SOCCCD and all other property owners in Neighborhood A (as designated in the Specific <br /> Plan) use all of the ADTs that are assigned to such properties pursuant to the Specific Plan as in <br /> effect as of the date that Amendment No. 5 is executed. The number of ADTs required by the <br /> County for its use and operation of the Center on the SOCCCD Exchange Parcel shall not exceed <br /> the number of ADTs allocated to the SOCCCD Exchange Parcel or, prior to the issuance of any <br /> development permits, be found to substantially change the trip distribution or peak hour trips <br /> assumptions in the Specific Plan. <br /> 2�C-31 Page 6 of 11 <br /> �7 1 <br />