Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-6918 <br />MAIN ST & 15TH ST TRAFFIC SIGNAL INSTALLATION <br />FEDERAL PROJECT NO: HSIPL 5063 (189) <br />Item <br />Description <br />Qty <br />Unit <br />UnitPriee <br />Amount <br />14 <br />Eastall CCTV and IP <br />Communication System <br />1 <br />LS <br />$1 UUW <br />$ <br />15 <br />Construct PCC Sidewalk <br />1344 <br />SF <br />$ Co ttJ <br />$ t'w-- <br />16 <br />Construct ADA Wheel Chair Ramp <br />Per City of Santa Ana Std. Plan No. <br />1122. <br />700 <br />SF <br />L <br />17 <br />AC Pavement <br />20 <br />TN <br />$ 3" �L <br />$ <br />18 <br />Pot hoirPole Locations for Utility <br />Conflicts Not on Plans <br />9 <br />EA <br />19 <br />Unclassified Excavation <br />60 <br />CY <br />$ � <br />$u/YVU <br />/ <br />20 <br />Sining and Striping <br />g <br />1 <br />LS <br />$N� A)o <br />$y/ 7vn <br />21 <br />Project Advertising Sign(s) <br />2 <br />EA <br />1/ C? <br />$ UU <br />22 <br />As -Built Plans <br />1 <br />LS <br />$5,000 <br />23 <br />Construction Permits <br />1 <br />LS <br />$10'000 <br />U/ UUU <br />TOTAL BASE BID $ `113� yy a <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications, The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />f This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within Eighty (80) working days after the commencement date stated in the Notice <br />to Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $500 per calendar day. <br />P-2 of P-52 <br />