Laserfiche WebLink
EXHIBIT 2 <br />City of Santa Ana <br />Section 3 New Hire Calculation Form <br />Project Name: Main Street At Walnut Street Traffic Signal Installation (Hybrid Beacon & Crosswalk U grade (RRFB) <br />Project Location: Main Street At Walnut Street Santa Ana CA 92701 <br />Street City State Zip <br />Contractor Name: Elecnor Belco Electric Inc. <br />Contractor Contact: John Wone <br />Contractor Telephone Number: 909-994-5470 <br />Contractor Email Address: jwong@elecnor.com <br />Section 3 Resident Hiring Goals <br />Trade/Craft Number of New Hires <br />Total Number of New Hires: <br />Total number of Section 3 resident new hires necessary to comply with contract: 0 <br />John Wong_ 11/24/2021 <br />Si a re of Con actor Date <br />