My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COLICH & SONS L.P
Clerk
>
Contracts / Agreements
>
PROJECTS
>
COLICH & SONS L.P
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 4:07:41 PM
Creation date
3/24/2022 2:30:50 PM
Metadata
Fields
Template:
Contracts
Company Name
COLICH & SONS L.P
Contract #
P 18-6616
Agency
Public Works
Council Approval Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />N <br />O <br />N <br />r-- <br />0 <br />Z <br />Project Number Project No. 18-6616 Flower Street Sewer <br />Wei R.lR, F-1 971Ra <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Change Order Number 2 <br />Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE UNIT PRICE <br />1. Remove and replace water main and laterals along Greenleaf Street between 17th and 19th <br />per attached plans and project specifications. (PCO #5) <br />2. Per C.S.A. Std. Plan 1101, remove and replace A-2-6 curb and add monolithic gutter. (PCO <br />#7) <br />3. Remove and replace miscellaneous driveways along Greenleaf Street between 17th and <br />19th in order to allow for storm water flow. (PCO #7) <br />4. 36" O.C. #4 Dowel 18" Long Epoxy Coated between curb and gutter and PCC pavement. <br />(PCO #7) <br />5. Perform survey and topography on Greenleaf to determine grades and elevations in <br />preparation of the addition of new curb and gutter. (PCO #8) <br />6. Install a concrete collar on a damaged stormdrain to repair and reinforce pipe. (PCO #6) <br />7. Miscellaneous extra work charged with time and materials. (PCO #9) <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.