Laserfiche WebLink
Exhibit 1 <br />-13- <br />SCOPE OF WORK OUTLINE <br />I. 'Timeline <br />A. CMAmusements will work with city of Santa Ana (CITY) to develop timeline to include <br />sufficient time, safety measures insetting up, operating and tearing down rides and games for <br />events <br />B. Time -line will include appropriate scheduling ofsecuring all permits and licenses prior to <br />commencement of event <br />II. Equipment <br />A. Ferris wheel, as required by city, along with mixture of major and kiddierides. <br />1. Merry Go Round <br />2. Paratrooper <br />3. Funhouse <br />4. Tornado <br />5. Sizzler <br />6. Zipper <br />7. Swings <br />S. Go Gator <br />9. Speedway <br />10. Loop O Plane <br />11. Roadster <br />12. Fun Slide <br />13. Train <br />14. Gravitron <br />15. Ferris Wheel <br />B. Support Equipment <br />1. Office trailer for management, accounting, and meetings <br />2. Two ticket booths, per CITY requirement <br />C. Four Game booths, per CITY requirement <br />III. Security <br />A. Licensed Security Company for overnight protection of equipment <br />B. Will work with CITY to develop security plan specific to city <br />C. Complete background checks on all employees <br />IV. Safety <br />A. Rides inspected and ticketed by OSHA <br />B. California Fire Code adhered too <br />C. Inspectionsb; all local, state jurisdiction.,; to inrhide-irPrle,pa,-ftpnt,hniildingfjepnrtrnenl�an any <br />� a C*Uofbodies of government, prior to opengik- 22 4/5/2022 <br />