My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - #04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
03/15/2022 Regular
>
Presentation - #04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 3:58:10 PM
Creation date
4/4/2022 3:55:46 PM
Metadata
Fields
Template:
City Clerk
Date
3/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Full closure of two, two -block segments on 4th Street. Drivers are detoured; <br />sidewalks are open to allow access to all businesses. Work includes track <br />installation, platform foundations and roadway restoration. <br />• On 4th Street, from Ross Street to French Street <br />o Phase 1: From Broadway to Main Street and from Bush St. to French St. <br />o Phase 2: From Ross Street to Broadway and from Main St. to Bush St. <br />• Phase 1 work began February 1, 2022 and is anticipated to last up to six -months <br />to reopen roadway. Construction crew work window from 6:00 a.m. to 3:30 p.m. <br />and detours are in place during the day and night. <br />t� <br />
The URL can be used to link to this page
Your browser does not support the video tag.