Laserfiche WebLink
b. Planting Plan including concrete mow strip layout and details. <br />c. Irrigation Plan including details and water calculations to conform to water conservation <br />issues (AB325). <br />d. Electrical/Lighting Plans including panel schedule and legend. <br />e. Final Construction Cost Estimate. <br />f. Specifications. <br />10. Construction documents will undergo a quality review process by Tatsumi. These quality review <br />documents will be made available for City QA/QC audits when requested. All submittals will <br />receive these quality reviews prior to submission to the City. <br />11. Upon 65% completion of the in -progress constructon documents, Tatsumi will submit 24N36" <br />review sets for the City's review. Upon the City's comments, Tatsumi will revise the construction <br />documents. <br />12. At 95% completion, Tatsumi will submit 24"06" review sets for the City's review. Based on <br />these review comments, Tatsumi will revise the construction documents. <br />13. 100% complete construction documents will be provided to the City in the form of 24N36" <br />reproducible full-size prints as well as digital CAD and word document files. All plans and <br />specificatons will be signed by the appropriate responsible oversight professional. <br />14. Construction Support with site visits, coordination meetings, Request for Information submittals, <br />and shop drawing reviews. Other services during construction include attendence at pre - <br />construction meetings, initial job walk, final through, assistance with preparation of punch list <br />and final inspections. <br />15. Upon the completion of construction, Tatsumi will generate as -built documents incorporating <br />the changes to the plans during construction. These as-builts will be signed and submitted to the <br />City on 24"06" mylar as well as digital CAD files. <br />Proposal: On Call landscape Architectural Consultant Services <br />City of Santa Ana <br />Tatsumi and Partners, Inc. <br />A <br />