Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL ADDENDUM NO. ONE <br />PROTECT NO.: 21-2727 <br />CABRILLO PARK IRRIGATION RENOVATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Marina Landscape, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Site Demolition (existing itTigation, misc <br />I <br />LS <br />$ <br />$ <br />demo) <br />: j Cam%_ I -C <br />�,�� cr'� . L-'-Z� <br />2 <br />Electrical/Controller/Conduit/wiring t <br />1 <br />LS <br />$ <br />$ <br />3 <br />Construct AC Paving (T=6") * <br />300 <br />SF <br />$ <br />I . t-e <br />$ <br />:1; 3EZ cL <br />4 <br />Construct Concrete Surface (T=6") * <br />1000 <br />SF <br />$ <br />$ <br />5 <br />Baseball Infield Mix * <br />1,000 <br />SF <br />$ <br />$ <br />6 <br />New Sod adjacent to Baseball Infield <br />(Kikuyu <br />1,500 <br />SF <br />$ <br />$ <br />grass)* <br />7 <br />Hibiscus, 15 Gal * <br />5 <br />EA <br />$ <br />$ <br />8 <br />Shrub, I Gal * <br />350 <br />EA <br />$17 <br />$ <br />9 <br />Shrub, 5 G a 1 * <br />150 <br />EA <br />$ ,,., <br />$ <br />10 <br />3" Thick Layer of Mulch <br />2000 <br />SF <br />$ <br />$ <br />11 <br />Project Advertisement Sign <br />1 <br />EA <br />$ <br />$ <br />12 <br />Irrigation Complete System <br />I <br />LS <br />$ <br />$ <br />13 <br />Landscaping and Irrigation Maintenance <br />1 <br />LS <br />$ <br />Period (90 Calendar Days) <br />14 <br />As -Built Plans <br />I <br />LS <br />$ 3,000 <br />$ 3,000 <br />P-1 ofP-]7 Page 4 of 12 <br />