My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E - RELEVANT PROJECT EXPERIENCE <br /> AEI has substantial experience in conducting Facility Condition Assessments (FCAs) on large portfolios <br /> of assets for government entities. AEI has a separate Capital Planning consulting team which <br /> specializes in the completion of Building Condition Assessments for Municipalities, K-12 School Systems <br /> and University Campuses. AEI utilizes state of the art data collection tablets and software to prepare <br /> our reports. AEI's Capital Planning team also has specialized experience in working with the <br /> municipalities and are specifically trained for this type of consulting. To date, AEI has completed FCA <br /> reports in excess of 50 Million SF of building space. <br /> AEI has substantial experience in providing these services which is outlined in the various sections of <br /> this Qualifications Package. Matt Wasson, who'll be acting as the Project Manager is an expert in <br /> performing Facility Condition Assessments for municipalities and university campuses. AEI will take a <br /> systematic approach to completing this FCA project. As can be seen in the attached qualifications <br /> package, the highlights and benefits of AEI's expertise are as follows: <br /> • Expert Facility Assessment Staff — AEI's team of professionals have municipal FCA experience, <br /> as well as over 200 years of combined experience in the fields of architecture, engineering, cost <br /> estimating and construction management. <br /> • Proven record of success in preparing FCAs on multiple park facilities. <br /> • Cutting Edge Technology — AEI will be utilizing tablet PCs in order to collect and streamline <br /> data, take representative photographs and perform a GPS inventory of equipment. <br /> • Dedication to Customer Service - AEI's depth of staff involved with the project will ensure that <br /> client questions and comments are responded to within 1 hour. <br /> • Training for facilities staff with respect to all aspects of AEI's deliverables. <br /> City of Bowie- Maryland Portfolio <br /> Client: City of Bowie Maryland <br /> Contact: George Stephanos— Director of Public Works (301) 262-6200; <br /> gstephanos@cityofbowie.org <br /> Project AEI prepared Facility Condition Assessments in accordance with ASTM E2018-15 on a <br /> Discussion portfolio of 18 buildings comprising over 165,000 SF and site work associated with <br /> several parks (concession stands, office buildings, vehicle storage and maintenance <br /> buildings and the Bowie City Hall. A Tier I ADA Survey is also included in the Scope of <br /> Work. The project was completed utilizing data-collection tablets and software similar <br /> to K Cloud. <br /> Date May 2017 & December 2018 <br /> M ► :r <br /> City Council AE1 Consultants 5/3/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.