My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E - RELEVANT PROJECT EXPERIENCE <br /> County of Kauai — Waste Water (CMMS) <br /> Client: County of Kauai <br /> Project The Wastewater Treatment Facilities Program is responsible for the operation, <br /> Discussion: maintenance and repair of all County wastewater collection, treatment and disposal <br /> facilities in order to provide a consistent and reliable level of performance necessary <br /> to protect health and the environment. Activities include preventive maintenance <br /> (PM), treatment process control, wastewater effluent reuse, solids management, <br /> safety and training, laboratory monitoring for regulatory compliance. <br /> Objectives for the Asset and Maintenance Management Control: <br /> 1. Identify and record all assets located at the four plants and associated pump <br /> stations located throughout the island. <br /> 2. Track and record ALL maintenance activities, both preventive and corrective. <br /> 3. Define PM requirements and establish leveled schedules designed to properly <br /> maintain assets and extend longevity. <br /> 4. Accurately monitor maintenance costs for all assets and support life cycle <br /> determinations. <br /> 5. Ability to produce reliable reporting measures. <br /> Current 1. Nearly 1,200 assets are being maintained by 25 maintenance staff distributed <br /> Status: among the four plants. <br /> 2. On-going interfacing to identify and document replacement and/or additional <br /> assets. <br /> 3. On-going training and support to include development/refinement of PM Tasks as <br /> well as Maintenance Routes designed to minimize work orders. <br /> 4. Database is providing feedback through on-line services and reports to assist <br /> management in developing future goals, projects, and schedules. <br /> 5. Reliance on maintenance management system for asset management. <br /> e `4. <br /> L Vl i e. <br /> City Council `' 21 — 1 5/3/2022 <br /> AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.