Laserfiche WebLink
0RFQ For On-Call Demolition Service <br /> M 6WZ-TECNNOLOGY <br /> Key Personnel Resumes <br /> Benefits of having Daniel Duarte your project: <br /> Relevant Experience <br /> $56.9-K Demolition of Facility at Peter Marshall Park in Anaheim, CA <<References Project#1 <br /> This project included the demolition, removal of building, block walls, capping of sewer laterals, <br /> disconnecting and capping utility services and appurtenant improvements, as well as the removal and <br /> disposal of asbestos-containing building materials found in structures and improvements at the facility. <br /> The installation of temporary chain link fences and gate was also included. <br /> $14.4-K Demolition of 8,723-SF of Fire Damaged Homes <<References Project#2 <br /> This project was initiated to "Make Safe Fire Damaged Homes" due to fires on October 9th, 2017. <br /> Residential buildings at 950, 954, and 970 Canyon Heights Drive in Anaheim, CA were uninhabitable and in <br /> danger of collapsing after being affected by one of the largest fires to hit Orange County, forcing several <br /> thousand people to evacuate Anaheim, Orange, and Tustin. MZT mobilized on site within hours of <br /> receiving the notification to begin demolition of three structures by utilizing excavators to push in the outer <br /> walls, or to pull walls inward in order to prevent additional damage to adjacent, less-damaged yellow- <br /> tagged properties. Prior to the disturbance, MZT temporarily braced walls that could fall in the wrong <br /> direction. Damaged stud walls were demolished from the top downward in a systematic manner with care <br /> not to buckle the wall. The roof, walls, and interior items were demolished inward toward the center of the <br /> foundation. Debris was consolidated on the slab as directed by the City of Anaheim. <br /> $12 -K Demolition of 5, 0 -SF Residential Lot in Anaheim, C <br /> This project consisted of demolition, removal of building, block walls, capping of sewer laterals, disconnect <br /> and cap utility services, installation and relocation of fences, and appurtenant improvements on the property <br /> at 1104 N. Homer Street, as well as the removal and disposal of asbestos-containing building materials <br /> found in structures and improvements at the property. In addition, the project included the removal and <br /> disposal of existing block walls, concrete footings, foundation, asphalt concrete and trees, installation of new <br /> chain link fences and gates, application of weed killer, and spreading of wood chips. <br /> $ 4. -K Partial Demolition of 1,614-SF of LA Fitness 2nd Floor at Los Angeles, CA <br /> This project involved the 1,614-SF partial demolition of the second floor of LA Fitness. We removed wood- <br /> framed partition walls as well as system components for electrical, mechanical, and structural systems. <br /> $799-K Demolition and Relocation of Utilities at Los Angeles, California <br /> This project involved the demolition, removal, and relocation of existing utilities such as electrical lines, <br /> condenser units, and appurtenances. <br /> $2.2-M Demolition and Repair of Pier 5 Waste Water Main at Naval Base San Diego, CA <br /> This project includes replacing the existing deteriorated sewer discharge forced main line at Pier 5 in Naval <br /> Base San Diego with a new HDPE main line system. Deteriorating pipes and incidental elements (pump <br /> suction pipes, coupling, wye connection, etc.)will be demolished at various points along the pipeline. Site <br /> preparation includes site clearing, excavation, fencing, and preparation for construction. Paving and site <br /> improvements include utility backfill and compaction, pavement resurfacing, and asphalt pressure testing. <br /> Debris generated by repair work will be hauled off-base and all fencing will be removed. <br />