Laserfiche WebLink
,I RFQ For On-Call Demolition Service <br /> MACRO-Z-TECHNOLOGY <br /> Understanding of Need <br /> Outline demonstrating MZT's understanding of the work. Includes anticipated approach, tasks <br /> necessary for successful completion, deliverables, and suggestions or special concerns that the City <br /> should be aware of. Identification of assumptions and exclusions used in preparing the scope of work <br /> and associated fee estimate. <br /> 1.1 Understanding of the Work <br /> Macro-Z-Technology Company (MZT) understands the City of Santa Ana's <br /> (City) need for an on-call contractor for the demolition and abatement work MZT is a Minority-owned <br /> anticipated under this contract. This need stems from planned demolition Business Enterprise <br /> requirements. An on-call contract provides the City with flexibility to adjust to <br /> changing needs over the next five years with the assurance that City has a (MBE) and Small <br /> competent demolition partner who can take on multiple, concurrent Task Businesses with our <br /> Orders (TO) over the entire on-call contract duration. headquarters right in <br /> All work must comply with applicable local, state, and federal requirements, Santa AnaThe City of Anaheim has <br /> such as: <br /> worked with MZT on an <br /> • California Stormwater Quality Association (CASQA) storm drain on-call demolition <br /> protection and wind & stormwater erosion control contract since 2016 <br /> • National Pollutant Discharge Elimination System (NPDES) We've demolished over <br /> • Orange County Program Construction Runoff Guidance Manual one-million square feet <br /> • Greensheets across more than 300 <br /> • Stormwater Pollution Prevention Plan (SWPPP) projects <br /> • Water Quality Management Plan (WQMP) of Orange County Our safety record is <br /> • Prevailing wage laws excellent with an EMR of <br /> • South Coast Air Quality Management District (SCAQMD) 0.68 for 2021 —way <br /> • MZT's Standard On-Call Agreement with the City below the industry <br /> The individual TOs could include abatement, hazardous material removal, average of 1.0 <br /> demolition, deconstruction, and site restoration. Each building will be unique, We're a local MBE and <br /> requiring an advanced demolition contractor to assess the structure and small business with our <br /> create a customized demolition plan. This plan will achieve full site headquarters in the <br /> demolition 100/o safely so that what remains is an empty lot brimming with Logan Barrio of Santa <br /> possibilities for development. <br /> Ana. Selecting MZT for <br /> 1.2 Antici atApproach, Tasks & Deliverables this contract will benefit <br /> MZT's approach supports the City's need to complete multiple, concurrent the local small <br /> demolition TOs over the next year as well as ongoing demolition services businesses economy. <br /> thereafter. This is an approach we've honed on more than 300 demolition <br /> projects, including projects completed for the City of Anaheim under an on-call contract. <br /> 1. .1 Phase 1: Request for TO Quote <br /> The City will request a TO quote from MZT. We will respond within 5 business days. As we process our <br /> response, we will coordinate with the City to visit the site, obtain as-built documents, and review any other City <br /> provided documentation (e.g., asbestos or lead hazard reports). We'll review documentation before the site <br /> visit so that we're well prepared. We'll provide the City with a fee proposal to complete the work along with any <br /> other documentation requested by the City in the Request for Quote. This documentation could include a <br /> description of work and a schedule from NTP to TO completion. <br /> 1.2.2 Phase 20 Pre-Demolition Preparation & Mobilization <br /> With the City's acceptance of our TO Quote and issuance of NTP, we will begin planning the work. This <br /> includes: <br /> • Holding a preconstruction meeting with the City to confirm expectations, site contacts, and schedule <br /> • Obtaining a demolition permit <br /> MEN'. <br />