Laserfiche WebLink
qrw% w Gdrovlvte O1r1ie <br /> INTERIORDAWOLITI©N,INC. 2621 f1a1717/u/u Avemle <br /> AS AW A, / aw&-ore, 41? 97020 <br /> 0E440UMN•ASArrP4&Vr-E.ARTNW0R)W wcvw/Rterrvrdemvltidn net <br /> LlC�e 6RSA'OD•/BlOJ?AP.AP.�? <br /> Asbestos/Lead Work Plan <br /> 1. 14 calendar days prior to beginning any work, a notification for asbestos <br /> removal activities was sent to the Air Quality Management District along with all <br /> applicable fees. <br /> 2. Interior Demolition, Inc. will post permits of all equipment on site per AQMD <br /> regulations. <br /> 3. All abatement work areas have been demarcated using warning & danger <br /> barrier tape & signs. The demarcated zone is a minimum of 20 feet from the <br /> work area. Additionally, warning signs will be placed at all entry and exits to <br /> help ensure public safety. <br /> 4. Interior Demolition, Inc. will utilize a three-stage decontamination unit which <br /> will be installed adjacent to the work area. This unit will be equipped with <br /> water & towels. Engineering controls such as negative air filtration machines, <br /> decontamination chambers & a disposal area will be utilized. <br /> 5. In order to contain all work areas, 6 mil poly will be erected and any stationary <br /> objects that are not being removed will also be covered. <br /> 6. Interior Demolition, Inc.'s abatement workers will utilize a NIOSH/MSHA <br /> approved half face negative pressure respirators. These masks will be <br /> equipped with a HEPA filter. Additionally, our workers are required to wear full <br /> body coveralls, disposable gloves & safety glasses. <br /> 7. Interior Demolition, Inc.'s workers will utilize wet methods when removing any <br /> ACM or Lead materials. <br /> 8. Interior Demolition, Inc. has chosen BDC Waste Management's hazardous <br /> waste division to handle to the transportation of the waste to their approved <br /> landfill. <br /> 9. Interior Demolition, Inc. will perform the OSHA required air sampling at a <br /> minimum of 25% of the work crew on a daily basis. <br /> 10. IDI will stabilize any lead demarcated by the survey prior to demolition. <br /> City Council 22 — 117 5/3/2022 <br />