Laserfiche WebLink
established. <br /> IDI will hold weekly meetings for its employees prior to work commencement. <br /> Additionally, IDI will require that subcontractors be required to hold similar meetings <br /> covering their respective portion of the work. These meetings are designed to discuss <br /> the projected work schedule and prepare each worker for any potential hazards <br /> associated with the work activities.A copy of the weekly safety meeting logs will be <br /> maintained onsite at all times. All personnel attending the safety meeting will be <br /> required to sign the safety-meeting log upon completion of the safety meeting. During <br /> the meetings, personnel will be reminded of site conditions and are encouraged to <br /> participate with health and safety concerns. <br /> At the conclusion of the project copies of all daily activities will be presented in a final <br /> report to the City of Santa Ana for distribution to relevant parties. <br /> 2.0 ASBESTOS AND LEAD ABATEMENT <br /> A work plan for the asbestos and lead abatement was issue in another document to <br /> General Services. Attached. <br /> 3.0 DEMOLITION ACTIVITIES <br /> Prior to commencement of building demolition, a thorough walk through and <br /> evaluation of the building will be conducted to confirm that all appropriate measures <br /> have been completed to ensure that the area is ready for commencement of <br /> demolition activities, including receiving asbestos clearance for each structure, <br /> ensuring that all utilities have been disconnected and the lines abandoned and making <br /> sure that there aren't any homeless persons inside the buildings. <br /> In general, the tasks will include a wide variety of procedures.The most important <br /> aspect in the development of these procedures will be the safe conduct of the work. <br /> IDI's procedures will limit the use of labor to the most controlled and safe conditions <br /> and rely upon mechanized means of removal wherever possible. 70,000 lb excavators <br /> equipped with concrete breakers, grapples, pulverizers and other modern hydraulic <br /> demolition tools and attachments will be utilized. Wherever possible, large structures <br /> will be removed to ground level using mechanized means. Subsequent sizing of scrap <br /> materials such as steel and rebar and other material processing activities will take <br /> place at grade level, hauled off site and recycled accordingly. <br /> General building/structure demolition will be conducted in a manner that does not <br /> interfere with or encroach upon the existing surrounding pedestrian and vehicular <br /> traffic during normal activities. IDI will provide fencing and a pedestrian canopy on <br /> 1301 W 11th St, Santa Ana. However, depending upon site and structure conditions, <br /> alternative methods of demolition and alternative types of equipment may be used to <br /> ensure the safest and most efficient means of operation. This may involve <br /> modification of the site fencing from time to time in order to comolete the demolition <br /> City Council 22 — 128 5/3/2022 <br />