My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana - East Station Facility <br />14 cfs Excess Groundwater <br />Item No. <br />Description <br />Quantity <br />Units <br />Unit Cost <br />Item Cost <br />1 <br />Mobilization/Demobilization/Miscellaneous <br />1 <br />LS <br />$ 1,200,000 <br />$ <br />1,200,000 <br />2 <br />EOCF#2 Pump Station (4 pumps - 400 hp motors) w/Surge Tank <br />1 <br />LS <br />$ 3,400,000 <br />$ <br />3,400,000 <br />3 <br />Reservoir Piping/Connections <br />1 <br />LS <br />$ 80,000 <br />$ <br />80,000 <br />4 <br />East Station Pump Station Upgrade <br />1 <br />LS <br />$ 300,000 <br />$ <br />300,000 <br />5 <br />New Well and Chlorination Treatment (to reservoir) <br />1 <br />LS <br />$ 3,600,000 <br />$ <br />3,600,000 <br />6 <br />24-inch EOCF#2 Water Main <br />4,300 <br />LF <br />$ 400 <br />$ <br />1,720,000 <br />7 <br />24-inch EOCF#2 Water Main (Arterial Street) <br />1,300 <br />LF <br />$ 500 <br />$ <br />650,000 <br />8 <br />Pavement Replacement (Grind and Cap) <br />160,000 <br />SF <br />$ 3 <br />$ <br />480,000 <br />9 <br />Pressure Reducing Facility (above ground) at SA-7 PRS Facility <br />1 <br />LS <br />$ 100,000 <br />$ <br />100,000 <br />10 <br />Piping Connections at SA-7 PRS Facility <br />1 <br />LS <br />$ 60,000 <br />$ <br />60,000 <br />11 <br />Connection to SA 24-inch Piping including 24" Valve on exist. Piping <br />1 <br />LS <br />$ 80,000 <br />$ <br />80,000 <br />12 <br />24-inch Piping and Valve <br />1 <br />LS <br />$ 60,000 <br />$ <br />60,000 <br />13 <br />24-inch Meter Flow Control Vault <br />1 <br />LS <br />$ 230,000 <br />$ <br />230,000 <br />14 <br />Connection to SA-7 Piping including 24" Valve on existing Piping <br />1 <br />LS <br />$ 120,000 <br />$ <br />120,000 <br />15 <br />Electrical and Scada Control Facilities <br />1 <br />LS <br />$ 100,000 <br />$ <br />100,000 <br />16 <br />Redhill and Warner Pavement (Grind and Cap) <br />40,000 <br />SF <br />$ 3 <br />$ <br />120,000 <br />SUBTOTAL <br />$ <br />12,300,000 <br />30% <br />CONTINGENCY <br />$ <br />3,700,000 <br />TOTAL $ 16,000,000 <br /> <br />City Council <br /> 30 – 52 <br />5/ 17/2022 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.