My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 30, 2022 <br />Mr. Cesar Barrera, P.E. <br />Page 3 of 4 <br />Reference: Proposal to Evaluate a Water Interconnection with Moulton Niguel Water District <br />agreements and negotiations with MNWD. <br />Prepare Technical Memoranda (engineering and/or financial analyses) pertaining to the <br />findings of Tasks 3, 4 and 5 (assume one memorandum for each task), if requested. <br />Task 7—Stakeholder Engagement <br />Attend meetings as requested with the Municipal Water District of Orange County <br />(MWDOC) and other agencies responsible for the operation and maintenance of the <br />EOCF#2 to identify the operational challenges to using the EOCF#2 under emergency <br />conditions. Review mitigations or solutions to address operational challenges identified as <br />part of the preliminary design. Assist in preparing presentation materials and or attending <br />meetings with various stakeholders including Orange County Water District (OCWD) or <br />other Orange County groundwater producers. Attend other stakeholder meetings as <br />requested. <br />Task 8—Additional Agreement <br />Assist in preparing a subsequent agreement between the City, MNWD, MWDOC, and <br />OCWD detailing the construction, operation, and funding of the recommended facilities if <br />the City elects to proceed with final design. Assist with preparing presentation materials <br />and meeting with the governing boards of stakeholders as requested. <br />rroposea ree <br />The estimated scope of work for engineering and financial review services are estimated <br />to cover a two-year period with an initial budget estimate of $200,000 as detailed in the <br />table. Fees will be invoiced based on time and materials. <br />Task <br />Budget, dollars <br />1 Project Administration <br />$15,000 <br />2 Review Requests for Proposal <br />5,000 <br />3 Engineering Review <br />70,000 <br />4 Environmental Review <br />20,000 <br />5 Business and Financial Analysis and Support <br />60,000 <br />6 Assist with Preparation of Materials for City Staff and City Council <br />10,000 <br />7 Stakeholder Agreement <br />10,000 <br />8 Additional Agreement <br />10,000 <br />Total <br />$200,000 <br />Design with community in mind <br />City Council 30 — 69 5/17/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.